Mira · Mira Oasis · Al Aryam

Mira and Mira Oasis Solar Panel NOC

Solar panels in Mira or Mira Oasis need the Al Aryam NOC. We check the roof and advise if DDA is needed.

Solar panels in Mira or Mira Oasis need the Al Aryam NOC. We check the roof structure and the panel layout, and review whether DDA is also needed for your job. Send us the supplier’s proposal, and we handle the rest.

NeedsAl Aryam NOC
RoofStructural check
DDAWe review and advise

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Roof load: We check the slab.
  • Waterproofing: Fixings must not damage it.
  • Supplier: Send us the layout.
  • Same in both: Mira and Mira Oasis.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Do I need a NOC for solar panels?

Yes.

Can you check my roof?

Yes.

Do I need DDA?

We review and advise.

What should I send?

The supplier’s proposal.

Related guides

Keep reading