How Do I Repair Concrete Spalling in My Building in Dubai?

Pieces of concrete falling off, rust stains or exposed steel bars on a balcony, soffit, column or car park. That is spalling. Here is how it is repaired properly in Dubai.

Concrete spalling is usually caused by the steel bars inside rusting and pushing the concrete off. The repair is: an engineer assesses the extent, a testing laboratory carries out the tests our engineers choose, a repair design is prepared, and a specialist contractor removes the damaged concrete, treats the steel and reinstates it. Where strengthening is needed, the authority asks for a concrete restoration or strengthening specialist stamp. Structural Solutions assesses, designs and follows the file until the final approval.

CauseRusting steel bars
Repair bySpecialist contractor
Design byStructural Solutions

Signs

Signs of spalling and what they mean

SignWhat it usually means
Rust stains on concreteSteel bars starting to corrode
Cracks along a beam or columnRust is pushing the cover off
Concrete pieces fallingAdvanced spalling; keep the area clear
Exposed steel barsSection loss; strengthening may be needed

Repair

How the repair is done

StageWhat happens
AssessmentSurvey; see building condition survey
TestingSee concrete testing of an existing building
DesignRepair method, materials and any strengthening
ApprovalDeveloper or building NOC and authority approval where needed
WorksSpecialist contractor, supervised by us

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Do not just patch over rusting steel.
  • Tests show how far it goes.
  • Specialist contractor repairs.
  • Strengthening: specialist stamp.

Documents you will need

  • Photos of the spalling
  • Building location and age
  • Existing drawings, if any
  • Building management contact

How it works

How we handle spalling repair

1. Photos

Send them.

2. Survey

Extent of damage.

3. Tests

Laboratory.

4. Design

Repair method.

5. Works

Supervised.

6. Close

Final approval where needed.

Questions

Concrete spalling: questions

How do I repair concrete spalling in my building?

Get an engineer assessment and repair design, then a specialist contractor removes the damaged concrete, treats the steel and reinstates it.

Is concrete spalling dangerous?

It can be. Falling pieces are a hazard and steel loss reduces strength, so have it assessed.

Can I just plaster over spalling?

No. The rusting steel keeps pushing the new plaster off.

Who pays in a tower: the owner or the owners association?

Common areas usually fall to the owners association. See tower concrete restoration for owners associations.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses spalling, designs the repair and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.