Question · Concrete repair · Updated November 2026

Do I Need a Specialist for Concrete Repair in Dubai?

Cracks, spalling or exposed steel in your building, villa or car park. Do you need a specialist, and who? Here is how it works across Dubai Municipality (DM), the Dubai Development Authority (DDA) and Trakhees CED.

For concrete repair in Dubai you need an engineer to assess the damage and design the repair, and a specialist contractor to carry it out. Where strengthening is involved, Dubai Municipality (DM), Dubai Development Authority (DDA) and Trakhees CED ask for a concrete restoration or strengthening specialist stamp. Structural Solutions assesses the structure, prepares the repair design, coordinates the specialist stamp and follows the file until the final approval.

EngineerAssessment and design
Specialist contractorCarries out the repair
StrengtheningSpecialist stamp needed

By damage

What to do by type of damage

DamageFirst step
Hairline cracks in plasterUsually not structural; we check
Cracks in beams, columns or slabsAssessment; see structural crack assessment
Spalling and rusting steelRepair design; see concrete spalling repair
Balcony or slab in doubtSee is my balcony or slab safe
Tower-wide damageSee tower concrete restoration for owners associations

By authority

Specialist stamps by authority

The authority is set by where the plot is. We confirm it before starting.

AuthoritySteel worksConcrete restoration or strengthening
Dubai Municipality (DM)Steel specialist contractor or subcontractor, appointed by the main contractorConcrete restoration specialist stamp where strengthening is involved; see DM concrete restoration stamp
Dubai Development Authority (DDA)Steel specialist stamp recognised by DDA; see steel specialist stamp for DDA approvalStrengthening specialist stamp; see DDA strengthening specialist stamp
Trakhees CEDSteel specialist or approved steel contractor stampConcrete restoration or strengthening specialist stamp

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Engineer first: before any repair.
  • Specialist contractor for the works.
  • Strengthening: specialist stamp.
  • We follow until final approval.

Documents you will need

  • Photos of the damage
  • Location and building type
  • Existing drawings, if any
  • Previous reports

How it works

How we handle concrete repair

1. Photos

Send them to us.

2. Visit

Condition survey.

3. Tests

By a laboratory.

4. Design

Repair method.

5. Approval

Where needed.

6. Works

Supervised.

Questions

Concrete repair: questions

Do I need a specialist for concrete repair in Dubai?

Yes: an engineer to assess and design, and a specialist contractor to repair. Strengthening also needs a specialist stamp.

Can a general maintenance company repair spalling?

Structural repair should follow an engineer design and be done by a specialist contractor.

Does every repair need authority approval?

Not every repair. Strengthening and structural changes do. We confirm the route after the assessment.

Do you carry out the repair?

No. We assess, design and supervise; a specialist contractor carries out the works.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses concrete damage, designs the repair, coordinates the specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading