Tilal Al Ghaf: what needs MAF approval? A to Z
Tilal Al Ghaf, what needs MAF approval: almost everything that changes your home, inside or outside, needs the MAF NOC before work starts. This A–Z answers the everyday questions, from flooring and AC units to sheds, CCTV and EV chargers.
In Tilal Al Ghaf any home improvement, meaning any work that modifies, removes, replaces or adds fixtures, fittings or boundaries, needs the MAF NOC before it starts, and major works also need a DDA permit. Some works are never allowed: cat ladders, blocking the utility meters, extra electrical load, cladding or façade changes, garage conversion and full balcony enclosure. When something is not listed, ask MAF first: works without approval get a penalty.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality
Never allowed in Tilal Al Ghaf
- Cat ladders: Not permitted
- Utility meters: Do not block access
- Electrical load: No additions
- Façade: No cladding or redesign
- Garage: No conversion
- Balcony: No full enclosure
Documents you will need
- Title deed and owner ID
- Sub-community and home type
- Plans from your handover documents (or we survey)
- Photos
- Contractor trade licence copy
- Scope of work and drawings (we prepare these)
A to Z
Tilal Al Ghaf: what needs MAF approval
Based on the MAF Home Improvement Guidelines.
| Item | Approval route | Guides |
|---|---|---|
| AC outdoor units Ask MAF | No extra load; outside look. | — |
| Artificial grass, paving, decking MAF NOC | Landscaping and hardscaping. | Landscaping |
| BBQ counter, outdoor kitchen MAF NOC | Hardscaping. | — |
| Balcony enclosure MAF NOC → DDA | Partial rear only. | Balcony |
| Carport cover MAF NOC | Light, below the parapet. | Carport |
| Cat ladder Not permitted | — | |
| CCTV, satellite dish Ask MAF | External change. | — |
| EV charger Ask MAF | No extra electrical load; DEWA. | — |
| Extension MAF NOC → DDA | Same outside look. | Extensions |
| False ceiling MAF + Civil Defence | No change to fire services. | Interior |
| Flooring, wardrobes MAF NOC | Minor works. | — |
| Garage conversion Not permitted | Garage | |
| Garden suite MAF NOC → DDA | Most villas, not all. | Garden suite |
| Jacuzzi, pond, fountain MAF NOC | Water features. | — |
| Kitchen, bathroom MAF NOC | Same location unless approved. | — |
| Painting outside MAF NOC | Per the guidelines. | Painting |
| Pergola, gazebo, awning MAF NOC | Max 2.8 m, 80 cm from the wall. | Pergola |
| Pool MAF + DDA + DM | 1.20 m from the wall. | Pool |
| Shed MAF NOC | Back garden, 80 cm, 2.8 m. | — |
| Solar panels DEWA → MAF NOC | Roof only, max 25% load. | Solar |
| Wall removal MAF NOC → DDA | Non-structural walls only. | Walls |
How it works
How to get any MAF approval
1. Photos
Send photos and your idea.
2. Check
Against the MAF Home Improvement Guidelines.
3. Drawings
Scope of work, drawings, calculations.
4. MAF NOC
We apply for you.
5. DDA permit
Building permit for major works.
6. Sign-off
Inspection, completion, deposit back.
Other questions Tilal Al Ghaf owners ask
Common mistakes
- Starting before the NOC
- Assuming small works are exempt
- Adding electrical load
- Changing the outside look
Not sure if you need approval?
Ask us on WhatsApp.
Send us three things on WhatsApp:
- What you want to do
- A photo of the area
- Your sub-community and home type
We tell you if it needs the MAF NOC, a DDA permit, or neither.
Questions
Do I need MAF approval for…?
What needs MAF approval in Tilal Al Ghaf?
Every home improvement: any work that modifies, removes, replaces or adds fixtures, fittings or boundaries, inside or outside, needs the MAF NOC before it starts. Major works also need a DDA permit.
Do I need approval to replace my kitchen or bathroom?
Yes. Fixtures can be replaced in the same place with approval; moving them is possible only without disturbing walls and MEP services.
Do I need approval for new flooring, wardrobes or a false ceiling?
Yes. Floor coverings, built-in wardrobes and false ceilings are listed works that need prior approval. Ceilings also need Civil Defence approval.
Do I need approval to paint inside?
Repainting interior walls is not listed in the guidelines, which cover changes to the property or its fixtures. If the work changes anything else, apply. If unsure, ask MAF.
Do I need approval to repaint outside?
Yes. External repainting must follow the architectural guidelines and needs the MAF NOC.
Can I install an EV charger?
Additional electrical load is not permitted under the MAF guidelines, so a charger must work within the home's existing load and needs DEWA approval. MAF decides; we check before you buy one.
Can I add or move AC outdoor units?
They change the outside of the home and may add electrical load, which is not permitted. Ask MAF before installing; we check the position and load.
Can I put a storage shed in the garden?
Treat it like other garden structures: in the back garden, at least 80 cm from the boundary wall and no higher than 2.8 m. It needs the MAF NOC, and MAF decides.
Can I install CCTV or a satellite dish?
Anything fixed to the outside of the home is an external change, so ask MAF first. Keep cables hidden and the look of the home unchanged.
Can I add window shutters, grilles or tinted film?
These change the façade, which must keep its uniform look. MAF decides.
Can I put a trampoline or play set in the garden?
Movable play equipment is not building work. Fixed play structures are hardscaping and need the MAF NOC.
Do I need approval for garden lighting?
Outdoor lighting is part of landscaping and hardscaping works and needs the MAF NOC. It must not add electrical load.
Can I lay artificial grass, paving or decking?
Yes, with the MAF NOC: grass is soft landscaping, and paving, tiling and decking are hardscaping.
Can I build a BBQ counter or outdoor kitchen?
Yes, with the MAF NOC. BBQ counters and recessed seating are hardscaping works.
Can I add a jacuzzi, pond or fountain?
Yes, with approval. Water features are listed as works that may be permitted.
Can I install a cat ladder?
No. Cat ladders are on the list of works that are not permitted.
Can I build around the utility meters?
No. Modifications that restrict access to the utility meters are not permitted.
Can a tenant apply for the NOC?
The MAF guidelines put the application and the responsibility on the owner. If you rent, ask your landlord to apply.
My NOC expired. How do I renew it?
Apply for renewal of the NOC with MAF; a renewal fee applies. Do not continue the works on an expired NOC.
What if I cancel my application?
MAF keeps a non-refundable application fee if you cancel after MAF has started reviewing the application.
Can I change my contractor after approval?
The NOC application includes the contractor's trade licence, so send MAF the new contractor's licence and get a new contractor access permit before they start.
Do I need approval for repairs and maintenance?
Like-for-like repairs that do not modify, remove, replace or add anything do not change the home. Anything beyond that needs the MAF NOC; if unsure, ask MAF.