Tilal Al Ghaf pergola rules: height, distance and approval
Tilal Al Ghaf pergola rules: pergolas must be open, no higher than 2.8 m and at least 80 cm from the boundary wall. Gazebos go in the back garden only, and shade structures are not permitted in front of the home. All need the MAF NOC. We prepare the drawings and handle it.
Under the MAF Home Improvement Guidelines, a pergola in Tilal Al Ghaf must be an open structure without enclosures, no higher than 2.8 m, not attached to the boundary wall and at least 80 cm from it. Gazebos follow the same height and distance and are allowed in the back garden only. Awnings and shade structures must be open, max 2.8 m, and not in front of the home. All are hardscaping works and need the MAF NOC.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality
What the MAF guidelines say
- Pergola: Open, max 2.8 m, 80 cm from the wall
- Gazebo: Back garden only, max 2.8 m
- Awning: Open, max 2.8 m, not at the front
- Fixing: Freestanding or on the ground-floor walls
- Boundary wall: Do not attach to it
- Drawings: Plan, elevation, material, fixing
Documents you will need
- Title deed and owner ID
- Sub-community and home type
- Plans from your handover documents (or we survey)
- Photos
- Contractor trade licence copy
- Scope of work and drawings (we prepare these)
By structure
Tilal Al Ghaf pergola, gazebo and awning rules
From the MAF Home Improvement Guidelines.
| Structure | Approval route | Guides |
|---|---|---|
| Pergola MAF NOC | Open, max 2.8 m, 80 cm from the boundary wall, not attached. | — |
| Gazebo MAF NOC | Back garden only, 80 cm from walls, max 2.8 m. | — |
| Awning or shade MAF NOC | Open, max 2.8 m, freestanding 80 cm off the wall or on the ground-floor walls. | — |
| Anything in front of the home Not permitted | Gazebos and shades go at the back. | Carport covers |
How it works
How to get your pergola approved in Tilal Al Ghaf
1. Photos
Send photos and your idea.
2. Check
Against the MAF Home Improvement Guidelines.
3. Drawings
Scope of work and drawings.
4. MAF NOC
We apply for you.
5. Works
9am to 5pm, NOC posted on the door.
6. Inspection
Booked with MAF, deposit back.
Other questions Tilal Al Ghaf owners ask
Common reasons pergolas are refused
- Higher than 2.8 m
- Closer than 80 cm to the boundary wall
- Attached to the boundary wall
- Enclosed sides or in front of the home
Planning a pergola or gazebo?
Send a photo of the garden. We check the position.
Send us three things on WhatsApp:
- A photo of the garden
- Your sub-community and home type
- The pergola or gazebo you like
We check the height and distance rules, prepare the drawings and get the MAF NOC.
Questions
Tilal Al Ghaf pergola questions
Do I need approval for a pergola in Tilal Al Ghaf?
Yes. Pergolas, gazebos, canopies and awnings are hardscaping works under the MAF Home Improvement Guidelines and need the MAF NOC before installation.
What are the pergola rules in Tilal Al Ghaf?
A pergola must be an open structure without any enclosures, no higher than 2.8 m, not attached to the boundary wall and at least 80 cm away from it.
What is the maximum pergola height in Tilal Al Ghaf?
2.8 m. The same limit applies to gazebos and to awnings and shade structures.
How far from the boundary wall must a pergola be?
At least 80 cm, and it must not be attached to the boundary wall.
Can I put a gazebo in my garden?
Yes, in the back garden only. Gazebos are not permitted in front of the home, must be at least 80 cm from the boundary walls and no higher than 2.8 m.
Can I add an awning or shade over my terrace?
Yes, if it stays open. An awning can stand on its own at least 80 cm from the boundary wall, or be fixed to the ground-floor walls. It must be no higher than 2.8 m and is not permitted in front of the home.
Can I close the sides of my pergola with glass or curtains?
No. Pergolas must stay open without enclosures, and shade structures must be open too. Enclosing them would turn them into a room.
Can I put a pergola or shade in front of my home?
Gazebos and shade structures are not permitted in front of the home. Place them in the back garden.
Wood, aluminium or steel: which pergola is allowed?
The guidelines set the shape and position, not one material: open, max 2.8 m, 80 cm from the wall. We include the material, colour and fixing details in the drawings for MAF.
What drawings are needed for a pergola NOC?
A garden plan showing the position and the 80 cm distance from the boundary wall, an elevation showing the height, the material and colour, and the fixing or foundation detail. With the scope of work and your contractor's trade licence.
I already built a pergola without approval. What now?
Apply for the NOC with drawings of what is built. If it breaks the rules (too high, too close to the wall or enclosed), it has to be changed. MAF can apply a penalty for works without approval.
Can my contractor start before the approvals?
No. Every home improvement in Tilal Al Ghaf needs the MAF NOC before work starts, and major works also need the DDA permit. Works carried out without approval get a penalty from Majid Al Futtaim and may have to be removed.
When can the works be done?
Between 9am and 5pm, not on weekends or public holidays. A copy of the MAF NOC must be posted on the front door or wall during the works, and your contractor needs a contractor access permit from MAF.
How much does a pergola cost in Tilal Al Ghaf?
It depends on the size and the scope. MAF charges an application fee and holds a refundable security deposit, confirmed when you apply. Send us photos and your idea, and we review and advise on our fee for the drawings and approvals.
What do you need from me to start?
Photos, your title deed, the sub-community and home type, and any plans from your handover documents. We tell you what the MAF Home Improvement Guidelines allow and what the submission needs.
Related guides
