Tilal Al Ghaf unapproved works: regularise, remove or sell?
Tilal Al Ghaf unapproved works: works that fit the MAF guidelines can usually be regularised with as-built drawings, the MAF NOC and, for major works, the DDA permit. Works against the guidelines have to be changed or removed, and MAF applies a penalty. We survey, advise and handle it.
The short answer
In Tilal Al Ghaf every home improvement needs the MAF NOC, so works done without it are unapproved and MAF applies a penalty fee. Works that fit the MAF Home Improvement Guidelines can usually be regularised: survey, as-built drawings and calculations, MAF NOC, then the DDA permit and completion for major works. Works on the not permitted list, such as a converted garage, a fully enclosed balcony or cladding, must be changed or removed. This matters most when you buy or sell.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality
What regularisation needs
- Survey: Of the works as built
- As-built drawings: Plans, elevations, sections
- Calculations: For structural works
- MAF NOC: For the existing works
- DDA permit: For major works
- Completion: Inspection and certificate
Documents you will need
- Title deed and owner ID
- Sub-community and home type
- Plans from your handover documents (or we survey)
- Photos
- Contractor trade licence copy
- Scope of work and drawings (we prepare these)
By type of work
Can it be regularised in Tilal Al Ghaf?
Based on the MAF Home Improvement Guidelines.
| Work | Approval route | Guides |
|---|---|---|
| Pergola, pool, interior, landscaping within the rules Usually yes | MAF NOC (+ DDA for major works). | — |
| Garage or carport converted No: change or remove | Change of use is not permitted. | Garage rules |
| Balcony fully enclosed No: change to partial | Partial rear enclosure only. | Balcony rules |
| Cladding or façade change No: reverse | Outside look must stay the same. | Façade rules |
How it works
How we regularise works
1. Photos
Send photos and any papers.
2. Survey
We measure what was built.
3. Check
Against the MAF guidelines.
4. Drawings
As-built drawings and calculations.
5. MAF + DDA
NOC and permit.
6. Completion
Inspection and certificate.
Other questions Tilal Al Ghaf owners ask
- What needs MAF approval (A–Z)
- Extensions
- Just bought: what can I change?
- Completion and deposit
- As-built drawings
- Renovation stopped
Why regularisation gets refused
- Works on the not permitted list
- Outside look changed
- No structural calculations
- Drawings that do not match the works
Unapproved works in your villa?
Send photos. We tell you what can be saved.
Send us three things on WhatsApp:
- Photos of the works
- Any drawings or approvals you have
- Your sub-community and villa type
We check what can be regularised and what must change.
Questions
Tilal Al Ghaf unapproved works questions
Can unapproved works in Tilal Al Ghaf be regularised?
Works that fit the MAF Home Improvement Guidelines can usually be regularised: we survey them, prepare as-built drawings and calculations, apply for the MAF NOC, and get the DDA permit and completion for major works. Works against the guidelines have to be changed or removed.
Which unapproved works cannot be kept?
Works on the not permitted list: a converted garage or carport, a fully enclosed balcony, cladding or a changed façade, extensions that change the outside look, cat ladders, works blocking the utility meters, and extra electrical load.
Is there a penalty for works without approval?
Yes. MAF applies a penalty fee for home improvement works carried out without approval, higher for major works than for minor works, in addition to the normal NOC process.
The previous owner extended the villa. How do I know if it was approved?
Ask for the MAF NOC, the DDA permit, the approved drawings and the completion certificate. If they do not exist or the works differ from the drawings, the extension is unapproved. We compare the villa with the approved drawings.
Do I need to fix unapproved changes before selling?
It is strongly advised. Buyers and their agents check approvals, unapproved works reduce trust and value, and the new owner inherits the problem. We regularise or advise on removal before you list.
Can I sell my villa with unapproved changes?
You can, but tell the buyer, and expect questions or a lower offer. Regularising first is the cleaner route.
Do non-structural works need approval?
Yes. In Tilal Al Ghaf all home improvements need the MAF NOC, including minor works such as tiling, gypsum and wardrobes. Major works also need a DDA permit.
What do you need to regularise works?
Photos, any drawings or approvals you have, the title deed, and access for a survey. We prepare the as-built drawings and handle the submissions.
When can the works be done?
Between 9am and 5pm, not on weekends or public holidays. A copy of the MAF NOC must be posted on the front door or wall, and your contractor needs a contractor access permit from the Belong app.
How much does it cost?
It depends on the scope of the regularisation. MAF charges its own application fee and holds a refundable deposit, confirmed when you apply. Send us the details and we review and advise on our fee.
What do you need from me to start?
Photos, your title deed, the sub-community and home type, and any plans from your handover documents. We tell you what the MAF Home Improvement Guidelines allow and what is needed.