Tilal Al Ghaf villa painting and façade: what is allowed
Tilal Al Ghaf villa painting: external repainting is allowed within the architectural guidelines and needs the MAF NOC. Cladding external walls and changing the façade design are not permitted. We prepare the NOC submission for you.
The short answer
You can repaint the outside of a Tilal Al Ghaf home, following the architectural guidelines and with the MAF NOC: external painting is a minor work. The MAF Home Improvement Guidelines do not permit cladding of external walls or modification of the façade design, so stone, tiles or a new façade style are not allowed. The aim is a uniform look across the community.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality
What the painting NOC needs
- Scope: Areas to be painted
- Colour: Within the guidelines
- Paint: Product specification
- Photos: Current façade
- Contractor: Trade licence copy
- Timing: 9am to 5pm working days
Documents you will need
- Title deed and owner ID
- Sub-community and home type
- Plans from your handover documents (or we survey)
- Photos
- Contractor trade licence copy
- Scope of work and drawings (we prepare these)
By change
Tilal Al Ghaf façade changes
From the MAF Home Improvement Guidelines.
| Change | Approval route | Guides |
|---|---|---|
| External repainting MAF NOC (minor work) | Per the architectural guidelines. | — |
| Cladding external walls Not permitted | On the not permitted list. | — |
| Façade design change Not permitted | Keeps the community uniform. | — |
| Main door relocation MAF NOC → DDA permit | Onto an existing slab. | Extensions |
How it works
How to get repainting approved
1. Photos
Send photos and your idea.
2. Check
Against the MAF Home Improvement Guidelines.
3. Drawings
Scope of work and drawings.
4. MAF NOC
Submitted in the Belong app.
5. Works
9am to 5pm, NOC posted on the door.
6. Inspection
Booked in the Belong app, deposit back.
Other questions Tilal Al Ghaf owners ask
Common reasons façade works are refused
- Colour outside the guidelines
- Cladding or stone added
- Façade design changed
- Works started before the NOC
Repainting your home?
Send photos. We prepare the NOC.
Send us three things on WhatsApp:
- Photos of the façade
- The colour you want
- Your sub-community and home type
We check the colour against the guidelines and get the MAF NOC.
Questions
Tilal Al Ghaf villa painting questions
Can I repaint my villa exterior in Tilal Al Ghaf?
Yes, with approval. External repainting must follow the architectural guidelines and needs the MAF NOC. It is a minor work.
Can I change the colour of my villa?
Only within the architectural guidelines, which keep the community uniform. MAF approves the colour in the NOC.
Do I need approval to repaint in the same colour?
External painting is listed as a minor work that needs the MAF NOC. Apply even for the same colour.
Can I add cladding or stone to my façade?
No. Cladding of external walls and modifying the façade design are on the list of works that are not permitted.
Can I make my villa look more modern?
Not by changing the façade design or adding cladding. Inside, you can renovate freely with approval, and outside you can repaint within the guidelines and add pergolas and landscaping.
Can I change my windows or doors?
Window and door changes alter the façade, which the guidelines protect. The main door can be relocated onto an existing slab with approval. Other changes are for MAF to decide.
What does MAF need for a painting NOC?
The scope of work, the colour and paint specification, photos of the façade and your contractor's trade licence.
Can my contractor start before the approvals?
No. Every home improvement in Tilal Al Ghaf needs the MAF NOC before work starts, and major works also need the DDA permit. Works carried out without approval get a penalty from Majid Al Futtaim and may have to be removed.
When can the works be done?
Between 9am and 5pm, not on weekends or public holidays. A copy of the MAF NOC must be posted on the front door or wall during the works, and your contractor needs a contractor access permit from the Belong app.
How much does a villa repaint cost in Tilal Al Ghaf?
It depends on the size and the scope. MAF charges an application fee and holds a refundable security deposit, confirmed when you apply. Send us photos and your idea, and we review and advise on our fee for the drawings and approvals.
What do you need from me to start?
Photos, your title deed, the sub-community and home type, and any plans from your handover documents. We tell you what the MAF Home Improvement Guidelines allow and what the submission needs.
Related guides
