Tilal Al Ghaf NOC for villa renovation: MAF NOC and DDA permit
Tilal Al Ghaf NOC for villa renovation: changes to homes in Tilal Al Ghaf need the Majid Al Futtaim (MAF) NOC through the MAF Belong app, then a DDA building permit for structural or external works. The route is the same in every sub-community. We prepare the drawings and handle both.
The short answer
Tilal Al Ghaf is the Majid Al Futtaim master community in Dubai. Every change to a villa or apartment needs the MAF NOC through the MAF Belong app first. Major works then need a DDA building permit, and a pool also needs the Dubai Municipality environmental NOC. The MAF Home Improvement Guidelines set the limits: extensions only if the outside look stays the same, no garage conversion, partial rear balcony enclosure only, pergolas no higher than 2.8 m and 80 cm from the boundary wall, pools 1.20 m from the boundary wall. In the Plagette 32 apartments, even minor internal modifications need MAF and DDA. What you can build depends on your villa type and plot, so we check yours first. The cost depends on the works: we review and advise.

Official sources: Majid Al Futtaim · Tilal Al Ghaf · Dubai Development Authority · Dubai Municipality (pool environmental NOC)
Tilal Al Ghaf NOC: what needs approval
- Extensions: Added rooms and floor area
- Garden suites: Most villas, not all
- Pools: MAF + DDA + DM environmental
- Pergolas and shades: With calculations
- Apartment interiors: Plagette 32: MAF + DDA
- External changes: Colour, façade, gates
Documents you will need
- Title deed and owner ID
- Sub-community, villa type and photos
- Plans from handover (or we survey)
- Drawings and calculations (we prepare these)
- Owner letter for sign-off
By sub-community
Tilal Al Ghaf NOC by sub-community
Same route everywhere: MAF NOC, then DDA.
| Sub-community | Approval route | Guides |
|---|---|---|
| Harmony I, II and III MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Harmony Bungalows MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Serenity MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Elysian Mansions MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Alaya MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Lanai Island MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Aura Gardens MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Elan MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Amara MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Calia Beach Collection MAF NOC → DDA permit | Same route; limits depend on villa type and plot. | Read more |
| Plagette 32 (apartments) MAF NOC → DDA permit (also internal changes) | Structure cannot be touched. | Read more |
How it works
How the Tilal Al Ghaf NOC works
1. Review
Your idea, photos and plans.
2. Check
Villa type, plot and guidelines.
3. Drawings
Drawings and calculations.
4. MAF NOC
Through the Belong app.
5. DDA permit
Building permit.
6. Sign-off
Inspection, completion, deposit back.
What Tilal Al Ghaf owners ask us about
- Garden suite
- Extend my villa
- Build a pool
- Renovate without approval?
- Renovation stopped
- Selling with unapproved changes
Common reasons for MAF or DDA comments
- Works outside the guidelines for the villa type
- Drawings that do not match the villa
- Missing structural calculations
- Works started before the NOC
Planning works in Tilal Al Ghaf?
Send your idea. We check what is possible.
Send us three things on WhatsApp:
- What you want to change
- Photos of the home
- Your sub-community and plans, if you have them
We tell you what is possible, the approvals needed and the cost for your scope.
Questions
Tilal Al Ghaf NOC questions
Who approves villa modifications in Tilal Al Ghaf?
Two approvals: the Majid Al Futtaim (MAF) NOC through the MAF Belong app, then a DDA building permit for structural and external works.
Is Tilal Al Ghaf under Dubai Municipality or DDA?
DDA. The only Dubai Municipality step is the environmental NOC for a swimming pool.
How do I apply for a renovation NOC in Tilal Al Ghaf?
Through the Belong app, the Majid Al Futtaim community app: select Home Improvement and follow the submission steps. We prepare the drawings and handle the submission with you, then the DDA permit for major works.
What documents does MAF need for a home improvement NOC?
The scope of work, drawings of the improvements, a copy of your contractor's trade licence and the application fee. We prepare the scope and the drawings.
What are the MAF Home Improvement Guidelines?
Majid Al Futtaim's rulebook for changing homes in Tilal Al Ghaf. It lists works that may be permitted with approval: internal changes, kitchens and bathrooms, false ceilings, flooring, wardrobes, landscaping, external repainting, carport covers, partial rear balcony enclosure, pergolas, awnings, canopies and water features. It also lists works that are not permitted.
What is not allowed in Tilal Al Ghaf?
Under the MAF Home Improvement Guidelines: extensions or structural changes that alter the outside look of the villa or its structural walls, converting the garage or carport into storage or living space, full balcony enclosure, cladding or changing the façade design, cat ladders, works that block access to the utility meters, and additional electrical load.
What is the difference between minor and major works?
Minor works include tiling, gypsum, cabinets, wardrobes, sanitary fixtures, external painting and solar panels. Major works include room remodelling, layout changes, balcony enclosures, ground-floor extensions and swimming pools. Major works also need a DDA permit, and MAF holds a larger refundable deposit.
Is there a fee and a deposit for the MAF NOC?
Yes. MAF charges an application fee and holds a refundable security deposit; both depend on whether the works are landscaping, minor or major. Added floor area has its own fee. MAF confirms the amounts when you apply.
When can contractors work in Tilal Al Ghaf?
Between 9am and 5pm, not on weekends or public holidays. A copy of the NOC must be posted on the front door or wall during the works, and the contractor needs a contractor access permit from the Belong app.
Is the MAF NOC enough to start construction?
No. Structural and external works also need the DDA building permit after the MAF NOC.
Which sub-communities are in Tilal Al Ghaf?
Harmony (I, II and III), Harmony Bungalows, Serenity, Elysian Mansions, Alaya, Lanai Island, Aura Gardens, Elan, Amara, Calia Beach Collection and the Plagette 32 apartments. The approval route is the same in all of them.
Do apartments in Tilal Al Ghaf need approval for interior changes?
Yes. In Plagette 32, internal modifications need the MAF NOC and a DDA permit, even minor ones. Structural elements cannot be touched.
Can I extend my Tilal Al Ghaf villa?
Yes, if the outside look of the villa stays the same: matching design, materials and colours, without blocking the neighbour's view. Changing the look or the façade is not permitted. Extensions add GFA and need the MAF NOC and a DDA permit.
What is a garden suite in Tilal Al Ghaf?
A separate ground-floor annex in the garden. It is possible for most villas, but not all, and counts as added GFA.
Can I build a pool in Tilal Al Ghaf?
Yes, with the MAF NOC, the DDA permit and the Dubai Municipality environmental NOC for the backwash. The pool must be at least 1.20 m from the boundary wall, with a safety fence and the deck no more than 30 cm above ground.
What are the rules for pergolas and gazebos in Tilal Al Ghaf?
They must be open with no enclosures, no higher than 2.8 m, and at least 80 cm from the boundary wall, not attached to it. Gazebos go in the back garden only, not in front of the home.
Where do I get the plans of my villa?
Use the plans from your handover documents. If you do not have them, we survey the villa and prepare as-built drawings.
Can I hire any contractor?
Use a contractor that is licensed for the works and acceptable to the developer and DDA. We coordinate the drawings and approvals with your contractor.
What happens if I renovate without the NOC?
The works can be stopped and may have to be regularised or removed, and unapproved works cause problems when you sell.
How do I get sign-off and my deposit back?
Once the site is cleared, book the inspection in the Belong app. For major works, MAF refunds the security deposit after you submit the DDA building permit, the approved drawings and the completion certificate. We prepare and obtain these.
How much does a Tilal Al Ghaf NOC and permit cost?
It depends on the works and the scope: an extension is not a pergola. Send us your idea, photos and any drawings you have, and we review them and advise.
What do you need from me to start?
Your title deed, the sub-community and villa type, photos, any drawings you have and what you want to change.
Related guides
