Just bought a villa in Tilal Al Ghaf? What you can change

Tilal Al Ghaf villa, what can I change: interiors, layouts, gardens, pergolas, pools, solar and extensions that keep the same outside look, all with the MAF NOC. Façade changes, cladding, garage conversion and full balcony enclosure are not allowed. We check your villa, or one you plan to buy.

The short answer

Under the MAF Home Improvement Guidelines, Tilal Al Ghaf owners can change interiors, kitchens, bathrooms and layouts, landscape the garden, add pergolas, gazebos, a pool, a carport cover and solar panels, repaint outside within the guidelines, partially enclose the rear balcony, and extend if the villa keeps the same outside look. Not allowed: façade changes, cladding, garage or carport conversion, full balcony enclosure, cat ladders and extra electrical load. Before buying, check that the previous owner's changes were approved.

ApprovalMAF NOC in the Belong app
Major worksAlso a DDA permit
Outside lookMust stay the same
Before buyingCheck previous changes

What you can and cannot change

  • Interiors: Kitchens, bathrooms, layouts
  • Garden: Landscaping, pergolas, pool
  • Extensions: Same outside look
  • Roof: Solar panels
  • Not allowed: Façade, cladding, garage conversion
  • Balcony: Partial rear enclosure only

Documents you will need

  • Title deed and owner ID
  • Sub-community and home type
  • Plans from your handover documents (or we survey)
  • Photos
  • Contractor trade licence copy
  • Scope of work and drawings (we prepare these)

Checks before buying

What to check before buying in Tilal Al Ghaf

Based on the MAF Home Improvement Guidelines.

CheckApproval routeGuides
Previous owner's changes
MAF NOC + DDA permit + completion
Ask the seller for all of them.Unapproved works
Your plans for the villa
MAF guidelines
We check them for that villa type.—
Handover or as-built plans
For future drawings
We survey if missing.As-built drawings
Garden suite potential
Most villas, not all
We check the villa type.Garden suite

How it works

How we help new owners

1. Photos

Send photos and your idea.

2. Check

Against the MAF Home Improvement Guidelines.

3. Drawings

Scope of work, drawings, calculations.

4. MAF NOC

Submitted in the Belong app.

5. DDA permit

Building permit for major works.

6. Sign-off

Inspection, completion, deposit back.

Other questions Tilal Al Ghaf owners ask

Common surprises for new owners

  • Previous changes without an NOC
  • Garage already converted
  • Balcony fully enclosed
  • Façade changed or clad

New to Tilal Al Ghaf?

Send your ideas. We tell you what is possible.

Send us three things on WhatsApp:

  1. Your sub-community and villa type
  2. Photos of the villa
  3. What you want to change

We check against the MAF guidelines and the previous owner's approvals.

Questions

Questions from new Tilal Al Ghaf owners

I just bought a villa in Tilal Al Ghaf. What can I change?

With MAF approval: interior changes, kitchens and bathrooms, flooring, false ceilings, wardrobes, room layouts, landscaping, pergolas and gazebos, a pool, a carport cover, solar panels, external repainting, a partial rear balcony enclosure, and extensions that keep the same outside look. A garden suite is possible for most villas.

What can I not change in Tilal Al Ghaf?

Changing the outside look or the façade, cladding, converting the garage or carport, fully enclosing a balcony, cat ladders, blocking the utility meters, and adding electrical load.

Can you check a villa before I buy it?

Yes. We check what the MAF guidelines allow for that villa type and plot, and whether any changes the previous owner made were approved. You know what you can build before you commit.

How do I know if the previous owner's changes were approved?

Ask the seller for the MAF NOC, the DDA permit, the approved drawings and the completion certificate for each change. If they are missing, the works may need to be regularised. We compare the villa with the approved drawings.

What happens if I buy a villa with unapproved changes?

You take over the problem: MAF can apply a penalty, and works outside the guidelines may have to be changed or removed before you can do new works. Check before you buy.

Can I start works straight after handover?

Yes, once you have the MAF NOC. Register in the Belong app, apply under Home Improvement, and get the DDA permit for major works.

Do I need the handover plans?

They are the base for the drawings. If you do not have them, we survey the villa and prepare as-built drawings.

How do I know if my renovation idea is possible?

Send us a short description and photos. We check it against the MAF Home Improvement Guidelines and tell you if it can be approved, before you pay for full drawings.

Do I need full drawings to ask if my idea is possible?

No. Photos and a description are enough for us to check. Drawings come after we confirm it is possible.

Are the rules the same in every sub-community?

Yes. The MAF Home Improvement Guidelines apply across Tilal Al Ghaf, from Harmony and Serenity to Elan and Alaya.

How much does it cost?

It depends on the scope of the works. MAF charges its own application fee and holds a refundable deposit, confirmed when you apply. Send us the details and we review and advise on our fee.

What do you need from me to start?

Photos, your title deed, the sub-community and home type, and any plans from your handover documents. We tell you what the MAF Home Improvement Guidelines allow and what is needed.