Where Do I Get My Plot DLTM Coordinates?
The plot corner coordinates are on your affection plan or site plan. To show what is actually built, or to set out works, you need a site survey in DLTM.
Your plot corner coordinates are shown on the affection plan or site plan of the plot. They tell you where the plot limit is, but not where your walls, paving, driveway or building actually stand. For developer or authority submissions that check works against the plot limit, the site is surveyed in DLTM and the existing and proposed works are drawn in true position.
What you need to know
- Affection plan: Plot corners and plot limit.
- Site survey: Walls, paving, access and buildings as built.
- Setting out: Works set out from surveyed points.
- Mismatch: If works and plot limit differ, the survey shows it.
Documents you will need
- Affection plan or site plan
- Any existing drawings: PDF or AutoCAD
- Photos of the plot and the area of works
- What the drawings are for: developer NOC, RTA or other
By submission
Where DLTM drawings are needed
We confirm the format for your submission.
| Submission | Approval route | Guides |
|---|---|---|
| Developer NOC AutoCAD DLTM plus PDF | Especially near the plot limit. | Developer NOCs |
| Nakheel plot access PDF plus AutoCAD DLTM | Common reason for returns. | Nakheel |
| RTA access or ROW NOC DLTM drawings | Plot vs road reserve. | RTA |
| Demarcation or plot limit Plot limit drawing | Inside vs outside. | Plot limit |
How it works
How we prepare DLTM drawings
1. Purpose
Which developer or authority the drawings are for.
2. Site survey
Plot, buildings, boundary, kerbs and features in DLTM.
3. Drawings
Existing and proposed works drawn in true DLTM position.
4. Plot limit
What is inside and outside the plot shown clearly.
5. Check
Drawing checked against the survey points.
6. Delivery
AutoCAD DWG plus PDF, ready to submit.
Who asks for it
Who asks for DLTM drawings
Master developers
Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.
Developer NOCs →Structural Solutions
Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.
Our DLTM survey →What we prepare
Why DLTM drawings get returned
- Drawing on a local grid, not in DLTM
- PDF only, no AutoCAD file
- Drawing not tied to a site survey
- Plot limit not shown
- Works on the drawing not matching the site
Questions
Questions owners and consultants ask
Where are my plot coordinates?
On the affection plan or site plan.
Is the affection plan enough?
For the plot corners, yes; for what is built, a survey is needed.
Can you survey my plot in DLTM?
Yes.
Related guides
