DLTM · Basics

What Is DLTM Format? Dubai Local Transverse Mercator Explained

DLTM (Dubai Local Transverse Mercator) is Dubai's local coordinate system. A drawing in DLTM format is an AutoCAD drawing set in those coordinates.

The short answer

DLTM stands for Dubai Local Transverse Mercator, the local coordinate system used in Dubai. A drawing in DLTM format is an AutoCAD drawing placed in those coordinates, so each point of the plot, building and works sits in its true position on the ground. That lets developers and authorities check works against the plot limit, the road reserve and other assets. A PDF has no coordinates, so it is not a DLTM drawing on its own.

DLTMDubai Local Transverse Mercator
FormatAutoCAD in DLTM coordinates
Not DLTMA PDF on its own

What you need to know

  • Coordinates: Every point has a real-world position in Dubai.
  • AutoCAD: The drawing is a DWG set in those coordinates.
  • PDF: Has no coordinates; delivered alongside the DWG.
  • UTM or WGS84: Different systems; transformed before a Dubai submission.

Documents you will need

  • Affection plan or site plan
  • Any existing drawings: PDF or AutoCAD
  • Photos of the plot and the area of works
  • What the drawings are for: developer NOC, RTA or other

By submission

Where DLTM drawings are needed

We confirm the format for your submission.

SubmissionApproval routeGuides
Developer NOC
AutoCAD DLTM plus PDF
Especially near the plot limit.Developer NOCs
Nakheel plot access
PDF plus AutoCAD DLTM
Common reason for returns.Nakheel
RTA access or ROW NOC
DLTM drawings
Plot vs road reserve.RTA
Demarcation or plot limit
Plot limit drawing
Inside vs outside.Plot limit

How it works

How we prepare DLTM drawings

1. Purpose

Which developer or authority the drawings are for.

2. Site survey

Plot, buildings, boundary, kerbs and features in DLTM.

3. Drawings

Existing and proposed works drawn in true DLTM position.

4. Plot limit

What is inside and outside the plot shown clearly.

5. Check

Drawing checked against the survey points.

6. Delivery

AutoCAD DWG plus PDF, ready to submit.

Who asks for it

Who asks for DLTM drawings

🏘️

Master developers

Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.

Developer NOCs →
🛣️

Authorities such as RTA

Check works against the plot and the road reserve in DLTM.

DLTM for RTA →
📐

Structural Solutions

Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.

Our DLTM survey →

Why DLTM drawings get returned

  • Drawing on a local grid, not in DLTM
  • PDF only, no AutoCAD file
  • Drawing not tied to a site survey
  • Plot limit not shown
  • Works on the drawing not matching the site

Questions

Questions owners and consultants ask

What does DLTM stand for?

Dubai Local Transverse Mercator.

Is a PDF a DLTM drawing?

No, a PDF has no coordinates.

Is DLTM the same as UTM?

No, they are different coordinate systems.

Related guides

Keep reading