Convert PDF or AutoCAD Drawings to DLTM Coordinates
A PDF is redrawn in AutoCAD; an AutoCAD drawing on a local grid is moved and rotated. Either way, it is placed in DLTM using surveyed points on site.
The short answer
Yes, drawings can be converted to DLTM, but not by simply changing the file. A PDF has no coordinates, so it is first redrawn in AutoCAD. An AutoCAD drawing on a local grid is moved, rotated and checked against points surveyed on site in DLTM, so it sits in its true position. Without survey data, the result cannot be relied on for a developer or authority submission.
What you need to know
- From PDF: Redrawn, then placed using the survey.
- From AutoCAD: Transformed to surveyed control points.
- From UTM or WGS84: Transformed and checked.
- Check: Positions checked against the site.
Documents you will need
- Affection plan or site plan
- Any existing drawings: PDF or AutoCAD
- Photos of the plot and the area of works
- What the drawings are for: developer NOC, RTA or other
By submission
Where DLTM drawings are needed
We confirm the format for your submission.
| Submission | Approval route | Guides |
|---|---|---|
| Developer NOC AutoCAD DLTM plus PDF | Especially near the plot limit. | Developer NOCs |
| Nakheel plot access PDF plus AutoCAD DLTM | Common reason for returns. | Nakheel |
| RTA access or ROW NOC DLTM drawings | Plot vs road reserve. | RTA |
| Demarcation or plot limit Plot limit drawing | Inside vs outside. | Plot limit |
How it works
How we prepare DLTM drawings
1. Purpose
Which developer or authority the drawings are for.
2. Site survey
Plot, buildings, boundary, kerbs and features in DLTM.
3. Drawings
Existing and proposed works drawn in true DLTM position.
4. Plot limit
What is inside and outside the plot shown clearly.
5. Check
Drawing checked against the survey points.
6. Delivery
AutoCAD DWG plus PDF, ready to submit.
Who asks for it
Who asks for DLTM drawings
Master developers
Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.
Developer NOCs →Structural Solutions
Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.
Our DLTM survey →What we prepare
- Redrawing and conversion
- Survey control points
Why DLTM drawings get returned
- Drawing on a local grid, not in DLTM
- PDF only, no AutoCAD file
- Drawing not tied to a site survey
- Plot limit not shown
- Works on the drawing not matching the site
Questions
Questions owners and consultants ask
Can a PDF be converted to DLTM?
Yes, by redrawing it in AutoCAD and placing it using a site survey.
How do I convert AutoCAD drawings to DLTM?
Move, rotate and check them against surveyed DLTM points.
Can it be done without a survey?
Not reliably for a submission.
Related guides
