Drawings · DLTM

DLTM Drawings in Dubai: AutoCAD Drawings in Dubai Coordinates

Developers and authorities in Dubai ask for AutoCAD drawings in DLTM coordinates, especially where works are near or outside the plot limit. We prepare them from our own site survey.

The short answer

DLTM drawings are AutoCAD drawings set in Dubai Local Transverse Mercator, the local coordinate system, so every line sits in its true position on the ground. Master developers and authorities such as RTA ask for them to check works against the plot, the boundary, the road reserve and community land, especially for works inside or outside the plot limit and for demarcation. We survey the site in DLTM, draw the existing and proposed works in true position, and deliver AutoCAD DWG plus PDF ready to submit.

FormatAutoCAD in DLTM coordinates
Based onOur site survey
Delivered asDWG plus PDF

What you need to know

  • Who asks: Master developers and authorities such as RTA.
  • Why: To check works against the plot limit and the road reserve exactly.
  • Survey first: Without a survey, a DLTM drawing is only an estimate.
  • Existing drawings: PDF or AutoCAD files can be converted, tied to the survey.
  • Returned drawings: A common reason is that they were not in DLTM.

Documents you will need

  • Affection plan or site plan
  • Any existing drawings: PDF or AutoCAD
  • Photos of the plot and the area of works
  • What the drawings are for: developer NOC, RTA or other

By submission

Where DLTM drawings are needed

We confirm the format for your submission.

SubmissionApproval routeGuides
Developer NOC
AutoCAD DLTM plus PDF
Especially near the plot limit.Developer NOCs
Nakheel plot access
PDF plus AutoCAD DLTM
Common reason for returns.Nakheel
RTA access or ROW NOC
DLTM drawings
Plot vs road reserve.RTA
Demarcation or plot limit
Plot limit drawing
Inside vs outside.Plot limit

How it works

How we prepare DLTM drawings

1. Purpose

Which developer or authority the drawings are for.

2. Site survey

Plot, buildings, boundary, kerbs and features in DLTM.

3. Drawings

Existing and proposed works drawn in true DLTM position.

4. Plot limit

What is inside and outside the plot shown clearly.

5. Check

Drawing checked against the survey points.

6. Delivery

AutoCAD DWG plus PDF, ready to submit.

Who asks for it

Who asks for DLTM drawings

🏘️

Master developers

Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.

Developer NOCs →
🛣️

Authorities such as RTA

Check works against the plot and the road reserve in DLTM.

DLTM for RTA →
📐

Structural Solutions

Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.

Our DLTM survey →

Why DLTM drawings get returned

  • Drawing on a local grid, not in DLTM
  • PDF only, no AutoCAD file
  • Drawing not tied to a site survey
  • Plot limit not shown
  • Works on the drawing not matching the site

Questions

Questions owners and consultants ask

What are DLTM drawings?

AutoCAD drawings in Dubai Local Transverse Mercator coordinates, in true position.

Who asks for DLTM drawings?

Master developers and authorities such as RTA, especially near the plot limit.

Do I need a site survey?

Yes, the drawings are tied to surveyed points.

In what format do you deliver?

AutoCAD DWG plus PDF.

Related guides

Keep reading