DLTM Drawings for RTA NOC

RTA reviews works in and near the road reserve against its own coordinate data. We prepare survey-based AutoCAD DLTM drawings for RTA access, sidewalk, right-of-way and related NOCs.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What the Drawings Show

Plot limit, road reserve, kerbs, footpaths, existing services and the proposed works, all in DLTM.

How We Prepare DLTM Drawings

01

Site Visit & Survey

02

Survey Points Fixed in DLTM

03

AutoCAD Drawings Prepared

04

Plot Limit & Works Shown

05

PDF + DWG Package Issued

06

Developer / Authority Submission

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Linked Approvals

Access design study, construction NOC, sidewalk modification permit, ROW NOC and light pole relocation.

Work We Prepare DLTM Drawings For

Access Design Study

Construction NOC

Sidewalk Permit

ROW NOC

Light Pole Relocation

Kerb Cut

DLTM Drawings for RTA NOC at a Glance

StepWhoWhat happens
1Structural engineerSurveys the road frontage and prepares drawings in DLTM coordinates for RTA.
2Master developer (where applicable)NOC for works in the community.
3RTAReviews the drawings and issues the NOC or permit.
4Service authoritiesDEWA and telecom clearances where services are affected.
5RTAInspection and reinstatement check after works.

Documents Required

  • Affection plan / site plan
  • Owner or company documents
  • Survey-based drawings in DLTM coordinates
  • Developer NOC (in master-developer communities)
  • Existing services information, where available

Key Technical Rules

  • Approval before road works: any work in the road reserve needs RTA approval first.
  • DLTM drawings: RTA reviews drawings in DLTM coordinates.
  • Utility clearances: DEWA and telecom services are checked where they run under the works.
  • Work zone safety: works follow RTA work zone traffic management rules.
  • Reinstatement: the road, kerb and footpath are reinstated and inspected.
As-built drawings and measured survey in Dubai — Structural Solutions

RTA Approval

Before road works

DLTM Drawings

Survey-based

Utility Clearances

Where needed

Why Owners and Contractors Choose Structural Solutions

Drawings From Our Own Site Survey

We survey the site and prepare the AutoCAD drawings in DLTM coordinates ourselves — not traced from a PDF.

Plot Limit Shown Clearly

Works within and outside the plot limit, demarcation lines and existing features are shown the way developers and authorities expect.

Ready for Submission

AutoCAD (DWG) in DLTM plus PDF sets, coordinated with the NOC or permit you are applying for.

Get Your DLTM Drawings Prepared

Send us your location, affection plan and what the drawings are for — we will arrange the site survey and prepare AutoCAD DLTM drawings ready for submission.

DLTM Drawings for RTA NOC — FAQs

Does RTA need DLTM drawings?

For works in and near the road reserve, drawings in DLTM coordinates are expected.

Do you survey the road frontage?

Yes.

What is DLTM?

DLTM (Dubai Local Transverse Mercator) is the local coordinate system used for surveys and drawings in Dubai.

Who asks for DLTM drawings?

Mainly master developers and authorities — especially to show works within or outside the plot limit, and for demarcation works.

Do you survey the site?

Yes — we prepare DLTM drawings based on our own site survey.

More DLTM & Drawing Guides

Get Your Drawings Now!