DLTM · Plot limit

Plot Limit DLTM Drawings: What Is Inside and Outside Your Plot

Plot limit drawings show exactly where your plot ends and what sits inside and outside it, walls, paving, structures and access, in DLTM from a site survey.

The short answer

A plot limit drawing shows the plot boundary in DLTM coordinates together with everything surveyed around it: boundary walls, paving, interlock, structures, the driveway and the road edge. Developers and authorities use it to see which works are inside the plot and which are outside, for example in the road reserve or on community land, and for demarcation works.

ShowsInside vs outside the plot
Used forNOCs and demarcation
Based onSite survey

What you need to know

  • Boundary: Plot corners from the affection plan.
  • Works outside: Paving, walls or access past the plot line.
  • Demarcation: Marking the plot limit on site.
  • Road reserve: Works there need RTA approval.

Documents you will need

  • Affection plan or site plan
  • Any existing drawings: PDF or AutoCAD
  • Photos of the plot and the area of works
  • What the drawings are for: developer NOC, RTA or other

By submission

Where DLTM drawings are needed

We confirm the format for your submission.

SubmissionApproval routeGuides
Developer NOC
AutoCAD DLTM plus PDF
Especially near the plot limit.Developer NOCs
Nakheel plot access
PDF plus AutoCAD DLTM
Common reason for returns.Nakheel
RTA access or ROW NOC
DLTM drawings
Plot vs road reserve.RTA
Demarcation or plot limit
Plot limit drawing
Inside vs outside.Plot limit

How it works

How we prepare DLTM drawings

1. Purpose

Which developer or authority the drawings are for.

2. Site survey

Plot, buildings, boundary, kerbs and features in DLTM.

3. Drawings

Existing and proposed works drawn in true DLTM position.

4. Plot limit

What is inside and outside the plot shown clearly.

5. Check

Drawing checked against the survey points.

6. Delivery

AutoCAD DWG plus PDF, ready to submit.

Who asks for it

Who asks for DLTM drawings

🏘️

Master developers

Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.

Developer NOCs →
🛣️

Authorities such as RTA

Check works against the plot and the road reserve in DLTM.

DLTM for RTA →
📐

Structural Solutions

Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.

Our DLTM survey →

What we prepare

Why DLTM drawings get returned

  • Drawing on a local grid, not in DLTM
  • PDF only, no AutoCAD file
  • Drawing not tied to a site survey
  • Plot limit not shown
  • Works on the drawing not matching the site

Questions

Questions owners and consultants ask

What is a plot limit drawing?

A DLTM drawing showing the plot boundary and what is inside and outside it.

Why do developers ask for it?

To check works near or outside the plot limit.

Is it based on a survey?

Yes.

Related guides

Keep reading