DLTM Coordinates Not Matching the Site: What It Means
When DLTM drawings do not match the site, either the drawing was not tied to a survey or the works were built off the plot line. A fresh survey shows which.
If walls, paving or access on site do not line up with the DLTM drawing, there are two usual causes: the drawing was never tied to surveyed points, or the works were built in a different place from the plot limit. A fresh DLTM site survey shows which one it is. If the drawing was wrong, it is corrected; if works sit outside the plot limit, they are shown as they are so they can be resolved with the developer or authority.
What you need to know
- Drawing error: Corrected to the survey.
- Works outside the plot: Shown as built, then resolved.
- Road reserve: Works there involve RTA.
- Before NOCs: Check early to avoid returned applications.
Documents you will need
- Affection plan or site plan
- Any existing drawings: PDF or AutoCAD
- Photos of the plot and the area of works
- What the drawings are for: developer NOC, RTA or other
By submission
Where DLTM drawings are needed
We confirm the format for your submission.
| Submission | Approval route | Guides |
|---|---|---|
| Developer NOC AutoCAD DLTM plus PDF | Especially near the plot limit. | Developer NOCs |
| Nakheel plot access PDF plus AutoCAD DLTM | Common reason for returns. | Nakheel |
| RTA access or ROW NOC DLTM drawings | Plot vs road reserve. | RTA |
| Demarcation or plot limit Plot limit drawing | Inside vs outside. | Plot limit |
How it works
How we prepare DLTM drawings
1. Purpose
Which developer or authority the drawings are for.
2. Site survey
Plot, buildings, boundary, kerbs and features in DLTM.
3. Drawings
Existing and proposed works drawn in true DLTM position.
4. Plot limit
What is inside and outside the plot shown clearly.
5. Check
Drawing checked against the survey points.
6. Delivery
AutoCAD DWG plus PDF, ready to submit.
Who asks for it
Who asks for DLTM drawings
Master developers
Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.
Developer NOCs →Structural Solutions
Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.
Our DLTM survey →What we prepare
Why DLTM drawings get returned
- Drawing on a local grid, not in DLTM
- PDF only, no AutoCAD file
- Drawing not tied to a site survey
- Plot limit not shown
- Works on the drawing not matching the site
Questions
Questions owners and consultants ask
Why do my DLTM drawings not match the site?
The drawing was not surveyed, or the works were built off the plot line.
How do I find out which?
A fresh DLTM site survey.
What if works are outside my plot?
They are shown as built and resolved with the developer or authority.