How Much Does a Balcony Closure Cost in The Springs?

Closing a balcony to gain a bigger bedroom or a small study is common in Springs townhouses. The price depends on how it is closed and Emaar counts a closed balcony as new floor area.

A balcony closure in The Springs is usually a smaller job than a ground floor extension: a glass or aluminium closure generally costs less than building masonry walls, and the balcony slab is already there. Built as a room, use about AED 800 to 1,500 per sq ft as the upper guide. Closing a balcony adds floor area, so Emaar’s AED 1,000 per sq ft fee for Springs townhouses applies. It also needs the Emaar NOC, because Emaar reviews the look from the street. We check your balcony and prepare the drawings to price.

Glass closureUsually the lower-cost option
Masonry roomUp to about AED 1,500/sq ft
EmaarNOC + AED 1,000/sq ft fee
Row of townhouses in The Springs, Dubai
The Springs, Emirates Living, Dubai
How Much Does a Balcony Closure Cost in The Springs?

Options

Glass or masonry: what changes

Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.

OptionTypical costNotes
Glass or aluminium closureUsually the lower-cost optionMust match the villa’s look; Emaar reviews it
Masonry walls with windowsUp to about AED 800 to 1,500 per sq ftAdds load on the slab, so we check the structure
Example: 60 sq ft balcony closed as a roomAED 48,000 to 90,000 for the worksPlus AED 60,000 Emaar floor area fee (60 sq ft x AED 1,000)

What changes the price

What pushes the cost up or down

FactorEffect
Glass or masonryMasonry adds weight and cost
StructureThe slab must carry the new walls
AC and electricsJoining the room to the bedroom
Look from the streetEmaar asks it to match the villa

Official fees

Official fees on top of the works (November 2026)

Emaar and Dubai Municipality set these and can change them.

ItemFee
Emaar NOCAED 2,000 total, including the AED 500 submission fee
Emaar added floor area (GFA) fee, Springs townhousesAED 1,000 per sq ft of new floor area, within the 10% allowance
Emaar security depositAED 10,000, refunded after clearance of the job
Dubai Municipality permitApprox. AED 1,000 to 2,000
Emaar fine for works without NOC and permitsAED 10,000 to 50,000

All costs

Springs cost guides

WorkGuide
Kitchen extensionkitchen extension cost
Study roomstudy room cost
Internal renovationinternal renovation cost
Back terrace extensionback terrace extension cost
Balcony closurebalcony closure cost
All costs in one placeSprings extension and renovation costs

Official sites: Dubai Municipality

What you need to know

  • Glass closure: usually the lower-cost option.
  • Masonry room: up to about AED 1,500/sq ft.
  • Emaar NOC always needed.
  • Floor area fee: AED 1,000/sq ft.

Documents you will need

  • Photos of the balcony inside and outside
  • Villa type and number
  • Title deed
  • Your idea

How it works

How to price your balcony closure

1. Photos

Send the balcony.

2. Check

Slab and look.

3. Design

Drawings to price.

4. Quotes

Contractors price it.

5. Approvals

Emaar and DM.

6. Works

Closure built.

How Much Does a Balcony Closure Cost in The Springs?

Questions

Springs balcony closure cost: questions

How much does a balcony closure cost in The Springs?

A glass or aluminium closure is usually the lower-cost option. Built as a masonry room, use about AED 800 to 1,500 per sq ft as the upper guide.

Does Emaar charge for closing a balcony?

Closing a balcony adds floor area, so Emaar’s AED 1,000 per sq ft fee for Springs townhouses applies, plus the AED 2,000 NOC.

Can every Springs balcony be closed?

Not always. Emaar reviews the look, and we check the slab. See closing a balcony in The Springs.

How much is your fee?

Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.

Who can help?

Structural Solutions checks Springs balconies, prepares the drawings contractors price and secures the Emaar NOC and permit. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.