The Springs · Cost guide · Updated November 2026

How Much Does a Kitchen Extension Cost in The Springs?

Springs townhouses have compact kitchens, so extending the kitchen into the garden is one of the most asked-for jobs. Here is what it typically costs to build, what Emaar charges on top, and how to get a price you can trust.

A kitchen extension in The Springs typically costs about AED 800 to 1,500 per sq ft to build, depending on the structure and the kitchen you choose. For a 120 sq ft extension that is roughly AED 96,000 to 180,000 for the works. On top, Emaar charges AED 1,000 per sq ft of new floor area for Springs townhouses (AED 120,000 for 120 sq ft), plus the Emaar NOC and the Dubai Municipality permit. Send us photos and your idea: we tell you what size works for your plot and prepare the drawings contractors price.

WorksAbout AED 800 to 1,500/sq ft
Emaar GFA feeAED 1,000/sq ft
AllowanceUp to 10% of floor area
Row of townhouses in The Springs, Dubai
The Springs, Emirates Living, Dubai
How Much Does a Kitchen Extension Cost in The Springs?

Worked example

Example: a 120 sq ft rear kitchen extension

Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.

ItemTypical cost
Construction (structure, walls, roof, finishes)AED 96,000 to 180,000
Emaar added floor area fee (120 sq ft x AED 1,000)AED 120,000
Emaar NOCAED 2,000
Dubai Municipality permitApprox. AED 1,000 to 2,000
Emaar security depositAED 10,000, refunded at the end
Engineering drawings and approvalsDepends on the drawings and scope; we review and advise

What changes the price

What pushes the cost up or down

FactorEffect
Size of the extensionThe biggest factor; the 10% allowance caps it
Foundations and structureNew footings and the roof slab tie-in
Kitchen fit-outCabinets, worktops and appliances can double the finishes budget
Moving servicesPlumbing, drainage, gas and ventilation add cost
Opening the rear wallA beam may be needed where the old wall comes out

Official fees

Official fees on top of the works (November 2026)

Emaar and Dubai Municipality set these and can change them.

ItemFee
Emaar NOCAED 2,000 total, including the AED 500 submission fee
Emaar added floor area (GFA) fee, Springs townhousesAED 1,000 per sq ft of new floor area, within the 10% allowance
Emaar security depositAED 10,000, refunded after clearance of the job
Dubai Municipality permitApprox. AED 1,000 to 2,000
Emaar fine for works without NOC and permitsAED 10,000 to 50,000

All costs

Springs cost guides

WorkGuide
Kitchen extensionkitchen extension cost
Study roomstudy room cost
Internal renovationinternal renovation cost
Back terrace extensionback terrace extension cost
Balcony closurebalcony closure cost
All costs in one placeSprings extension and renovation costs

Official sites: Dubai Municipality

What you need to know

  • Build cost: about AED 800 to 1,500/sq ft.
  • Emaar GFA fee: AED 1,000/sq ft on top.
  • 10% allowance of the existing floor area.
  • Drawings first so quotes compare like for like.

Documents you will need

  • Photos of the kitchen and the garden side
  • Villa and plot number
  • Title deed
  • Your idea or a sketch

How it works

How to get a reliable price for your kitchen extension

1. Photos

Send us your idea.

2. Check

Size, plot, structure.

3. Design

Drawings to price.

4. Quotes

Contractors price it.

5. Approvals

Emaar and DM.

6. Build

Works start.

How Much Does a Kitchen Extension Cost in The Springs?

Questions

Springs kitchen extension cost: questions

How much does a kitchen extension cost in The Springs?

Typically about AED 800 to 1,500 per sq ft to build. A 120 sq ft extension is roughly AED 96,000 to 180,000 for the works, plus the Emaar fees.

Does Emaar charge for the extra floor area?

Yes. For Springs townhouses, Emaar charges AED 1,000 per sq ft of new floor area within the 10% allowance. See Springs extension fees.

How big can my kitchen extension be?

Up to about 10% of the existing floor area, as Emaar allows in The Springs. Anything above is strictly reviewed. See how much bigger a Springs villa can be.

Why do contractor quotes differ so much?

Usually because each one prices a different scope. With one set of drawings, every contractor prices the same job.

Is a new kitchen included in the price per sq ft?

The range covers the built extension with standard finishes. A high-end kitchen fit-out sits at the top of the range or above.

How much is your fee?

Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.

Who can help?

Structural Solutions designs Springs kitchen extensions, prepares the drawings contractors price and secures the Emaar NOC and Dubai Municipality permit. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.