Can I Close My Balcony in The Springs?

Can I Close My Balcony in The Springs? Often, yes, with an Emaar NOC and a Dubai Municipality permit. A closed balcony becomes floor area, so it counts toward the extension allowance.

The short answer

Closing a balcony with glass or walls turns it into enclosed floor area. Emaar reviews how it looks from outside and counts the area toward the extension allowance. It needs an Emaar NOC, a Dubai Municipality permit and a check of the balcony slab for the new walls or glazing. Villas in The Springs can extend by up to 10% of the existing floor area, per Emaar. Anything above 10% is strictly reviewed by Emaar management and may not be approved.

Developer NOCEmaar NOC
AuthorityDubai Municipality
PlansEmaar provides as-built plans
close my balcony in The Springs

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the as-built plans, so the extension allowance is right.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in The Springs
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

The approval route in The Springs

The Springs is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar Community Management
NOC. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in The Springs

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Emaar as-built plans, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in The Springs

  • Extension: up to 10% per Emaar, Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Emaar rate in The Springs

Springs extension fee: AED 1,000 per sq ft

Springs homes are townhouses, so Emaar charges one flat rate on the added gross floor area (GFA), within the 10% limit, subject to Emaar review.

ItemRate or ruleNote
Springs townhouse, within 10%AED 1,000 per sq ftFlat rate on the added GFA, subject to Emaar review
Above 10%No higher townhouse bandStrictly reviewed by Emaar management and may not be approved
Example: Type 3EAbout 20 m² (about 215 sq ft)About AED 215,000, subject to Emaar review

Emaar confirms the final amount when it reviews the application. The Dubai Municipality permit fee is separate. The Springs extension fees

Questions

Questions owners ask in The Springs

Can I Close My Balcony in The Springs?

Often, yes, with an Emaar NOC and a Dubai Municipality permit, if the design suits the villa’s look.

Does a closed balcony count as an extension?

Yes. It becomes enclosed floor area and counts toward the allowance and the fees.

Can I use glass instead of walls?

Often glazing is easier to accept. It still adds enclosed area and needs the NOC.

Does the balcony slab need checking?

Yes, for the weight of new walls or glazing, with stamped calculations.

What approvals are needed?

An Emaar NOC, and a Dubai Municipality permit where the works are structural or add floor area.