The Springs · Cost guide · Updated November 2026

The Springs Extension and Renovation Costs: 2026 Guide

One page with the typical costs for the jobs Springs owners ask about most: kitchen extensions, study rooms, back terraces, balcony closures and internal renovations, plus the Emaar fees most quotes leave out.

In The Springs, extensions typically cost about AED 800 to 1,500 per sq ft to build, and Emaar adds AED 1,000 per sq ft of new floor area for townhouses, within a 10% allowance. Internal renovations typically cost about AED 150 to 300 per sq ft basic, AED 350 to 600 mid-range and AED 700 to 1,000 or more premium, with no floor area fee. The Emaar NOC is AED 2,000 and the Dubai Municipality permit about AED 1,000 to 2,000. We plan the work and prepare drawings so every contractor prices the same job.

ExtensionAbout AED 800 to 1,500/sq ft
Emaar GFA feeAED 1,000/sq ft
RenovationAbout AED 150 to 1,000+/sq ft
Street of townhouses in The Springs, Emirates Living, Dubai
The Springs, Emirates Living, Dubai
The Springs Extension and Renovation Costs: 2026 Guide

At a glance

Typical costs in The Springs

Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.

WorkTypical construction costEmaar floor area feeGuide
Kitchen extensionAbout AED 800 to 1,500/sq ftAED 1,000/sq ftkitchen extension cost
New study roomAbout AED 800 to 1,500/sq ftAED 1,000/sq ftstudy room cost
Study from existing spaceAbout AED 350 to 600/sq ftNonestudy room cost
Enclosed back terraceAbout AED 800 to 1,500/sq ftAED 1,000/sq ftback terrace extension cost
Balcony closureGlass usually lower; masonry up to about AED 1,500/sq ftAED 1,000/sq ftbalcony closure cost
Internal renovationAbout AED 150 to 1,000+/sq ft by levelNoneinternal renovation cost

What quotes leave out

The costs owners often miss

ItemTypical amount
Emaar floor area fee on extensionsAED 1,000 per sq ft of new floor area
Emaar NOCAED 2,000
Refundable Emaar depositAED 10,000
Dubai Municipality permitApprox. AED 1,000 to 2,000
Fine if works start without NOC and permitsAED 10,000 to 50,000

Before you budget

Useful Springs guides

TopicGuide
How much bigger your villa can behow much bigger a Springs villa can be
Springs villa typesSprings villa types
Extension fees explainedSprings extension fees
Full approvals guideSprings renovation approvals guide

Official sites: Dubai Municipality

What you need to know

  • Extensions: about AED 800 to 1,500/sq ft.
  • Emaar fee: AED 1,000/sq ft new area.
  • Renovation: about AED 150 to 1,000+/sq ft.
  • One set of drawings for fair quotes.

Documents you will need

  • Photos of the area to change
  • Villa type and number
  • Title deed
  • Your idea or a sketch

How it works

From idea to a price you can trust

1. Photos

Send your idea.

2. Check

What your villa allows.

3. Design

Drawings to price.

4. Quotes

Contractors price it.

5. Approvals

Emaar and DM.

6. Works

Build starts.

The Springs Extension and Renovation Costs: 2026 Guide

Questions

Springs costs: questions

How much does it cost to extend a Springs villa?

Typically about AED 800 to 1,500 per sq ft to build, plus Emaar’s AED 1,000 per sq ft fee on the new floor area for townhouses.

How much does a Springs renovation cost?

About AED 150 to 300 per sq ft basic, AED 350 to 600 mid-range and AED 700 to 1,000 or more premium.

What do contractor quotes usually leave out?

The Emaar floor area fee, the NOC, the deposit and the Dubai Municipality permit. Our pages list them so your budget is complete.

How do I get an accurate price?

Send us photos and your idea. We check what your villa allows and prepare drawings that contractors price like for like.

How much is your fee?

Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.

Who can help?

Structural Solutions plans Springs extensions and renovations, prepares the drawings contractors price and secures the Emaar NOC and Dubai Municipality permit. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading