How Much Does a Back Terrace Extension Cost in The Springs?
Turning the back garden into a covered terrace or an enclosed garden room is a popular way to gain space in a Springs townhouse. The cost depends mostly on one thing: whether it stays open or becomes a closed room.
A back terrace in The Springs costs much less when it stays open: a pergola or shade structure is a separate, simpler job. Enclosing the terrace into a room is an extension, typically about AED 800 to 1,500 per sq ft to build, and new floor area attracts Emaar’s AED 1,000 per sq ft fee for Springs townhouses. An enclosed terrace counts as new floor area, so budget for the fee. We check the design and prepare the drawings contractors price.


Options
Open or enclosed: what changes
Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.
| Option | Typical cost | Approval |
|---|---|---|
| Pergola or shade over the terrace | Lower; depends on the material and size | Emaar NOC, see Springs pergola NOC |
| Enclosed terrace room (walls, windows, roof) | About AED 800 to 1,500 per sq ft | Emaar NOC and Dubai Municipality permit |
| Example: 150 sq ft enclosed terrace room | AED 120,000 to 225,000 for the works | Plus AED 150,000 Emaar floor area fee (150 sq ft x AED 1,000) |
What changes the price
What pushes the cost up or down
| Factor | Effect |
|---|---|
| Open or closed | Closing it in adds walls, glazing, AC and the floor area fee |
| Roof type | A concrete slab costs more than a light roof |
| Glazing | Large sliding glass panels are a big part of the cost |
| Foundations | New walls need footings |
Official fees
Official fees on top of the works (November 2026)
Emaar and Dubai Municipality set these and can change them.
| Item | Fee |
|---|---|
| Emaar NOC | AED 2,000 total, including the AED 500 submission fee |
| Emaar added floor area (GFA) fee, Springs townhouses | AED 1,000 per sq ft of new floor area, within the 10% allowance |
| Emaar security deposit | AED 10,000, refunded after clearance of the job |
| Dubai Municipality permit | Approx. AED 1,000 to 2,000 |
| Emaar fine for works without NOC and permits | AED 10,000 to 50,000 |
All costs
Springs cost guides
| Work | Guide |
|---|---|
| Kitchen extension | kitchen extension cost |
| Study room | study room cost |
| Internal renovation | internal renovation cost |
| Back terrace extension | back terrace extension cost |
| Balcony closure | balcony closure cost |
| All costs in one place | Springs extension and renovation costs |
Official sites: Dubai Municipality
What you need to know
- Open pergola: the lower-cost option.
- Enclosed room: about AED 800 to 1,500/sq ft.
- Floor area fee: AED 1,000/sq ft once enclosed.
- We check before you budget.
Documents you will need
- Photos of the back garden
- Villa and plot number
- Title deed
- Your idea or a sketch
How it works
How to price your back terrace
1. Photos
Send the garden.
2. Option
Open or enclosed.
3. Design
Drawings to price.
4. Quotes
Contractors price it.
5. Approvals
Emaar and DM.
6. Build
Works start.

Questions
Springs terrace cost: questions
How much does a back terrace extension cost in The Springs?
An open pergola is the lower-cost option. Enclosing the terrace into a room typically costs about AED 800 to 1,500 per sq ft to build.
Does an enclosed terrace count as extra floor area?
Yes. Once the terrace is enclosed it counts as new floor area, so Emaar’s AED 1,000 per sq ft fee applies for Springs townhouses, within the 10% allowance.
Can I build a garden room instead?
Possibly. See garden room in The Springs.
How much is your fee?
Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.
Who can help?
Structural Solutions designs Springs terraces and garden rooms, prepares the drawings contractors price and secures the approvals. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
