How Much Does an Internal Renovation Cost in a Springs Villa?
Most Springs homes are now 20 years old or more, so many owners renovate the kitchen, bathrooms and floors in one go. Here is what an internal renovation typically costs per sq ft, by finish level.
An internal renovation in a Springs villa typically costs about AED 150 to 300 per sq ft for a basic refresh, AED 350 to 600 per sq ft for a mid-range renovation and AED 700 to 1,000 or more per sq ft for premium finishes. For a 600 sq ft ground floor, that is roughly AED 90,000 to 180,000 basic, AED 210,000 to 360,000 mid-range or AED 420,000 to 600,000 premium. Paint, flooring and like-for-like fittings need no approval; moving walls, the kitchen or bathrooms needs the Emaar NOC. We plan the layout and prepare the drawings contractors price.


By finish level
Renovation cost per sq ft
Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.
| Level | What it usually includes | Typical cost |
|---|---|---|
| Basic refresh | Paint, new flooring, light fittings, minor repairs | About AED 150 to 300 per sq ft |
| Mid-range | New kitchen and bathrooms, flooring, doors, some layout changes | About AED 350 to 600 per sq ft |
| Premium | Full redesign, high-end kitchen and bathrooms, joinery, new services | About AED 700 to 1,000+ per sq ft |
Worked example
Example: a 600 sq ft ground floor
| Level | Typical cost |
|---|---|
| Basic | AED 90,000 to 180,000 |
| Mid-range | AED 210,000 to 360,000 |
| Premium | AED 420,000 to 600,000+ |
What changes the price
What pushes the cost up or down
| Factor | Effect |
|---|---|
| Kitchen and bathrooms | The most expensive rooms per sq ft |
| Layout changes | Moving walls or the kitchen adds design, structure and services work |
| Old services | Older homes may need new plumbing, electrics or AC |
| Finishes | Stone, joinery and imported fittings move you up a level |
Approvals
Which renovation works need approval
| Work | Approval |
|---|---|
| Paint, flooring, fittings like for like | No approval needed |
| Moving walls, kitchen or bathrooms | Emaar NOC |
| Structural walls, beams or new openings | Emaar NOC and Dubai Municipality permit with stamped calculations |
All costs
Springs cost guides
| Work | Guide |
|---|---|
| Kitchen extension | kitchen extension cost |
| Study room | study room cost |
| Internal renovation | internal renovation cost |
| Back terrace extension | back terrace extension cost |
| Balcony closure | balcony closure cost |
| All costs in one place | Springs extension and renovation costs |
Official sites: Dubai Municipality
What you need to know
- Basic: about AED 150 to 300/sq ft.
- Mid-range: about AED 350 to 600/sq ft.
- Premium: AED 700 to 1,000+/sq ft.
- Layout changes need the Emaar NOC.
Documents you will need
- Photos of each room
- Villa type and number
- Title deed
- Your wish list
How it works
How to budget a Springs renovation
1. Photos
Send your wish list.
2. Plan
Layout and level.
3. Design
Drawings to price.
4. Quotes
Contractors price it.
5. Approvals
Where needed.
6. Works
Renovation starts.

Questions
Springs renovation cost: questions
How much does it cost to renovate a Springs villa?
Typically about AED 150 to 300 per sq ft for a basic refresh, AED 350 to 600 for mid-range and AED 700 to 1,000 or more for premium finishes.
Do I need approval to renovate my Springs villa?
Like-for-like finishes are light works. Moving walls, the kitchen or bathrooms needs the Emaar NOC, and structural changes also need a Dubai Municipality permit.
Can I open up the ground floor?
Often yes, after a structural check. See opening up walls in a Springs villa.
Why do renovation quotes vary so much?
Each contractor assumes different finishes and scope. Drawings and a finishes list let every quote cover the same job.
How much is your fee?
Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.
Who can help?
Structural Solutions plans Springs renovations, prepares the drawings contractors price and secures the Emaar NOC and permits where needed. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.