Can I add a steel mezzanine to my warehouse?

Often yes, after a structural check. The mezzanine needs a steel design with stamped calculations, a check of the slab and columns it sits on, the approval of the authority for the area and DCD approval. A mezzanine may add floor area.

The short answer

A mezzanine adds weight and people to the warehouse floor, and changes fire safety and escape. Our engineers design the steel frame and connections, check the slab and any connection to the building, and prepare the package for Dubai Municipality, DDA or Trakhees CED depending on the area, plus DCD.

FirstSlab and structure check
DesignSteel frame and connections, stamped
ApprovalAuthority by area, plus DCD

What you need to know

  • Slab: Must carry the mezzanine columns.
  • Steel: Frame, deck and connections.
  • Floor area: A mezzanine may add floor area.
  • Fire safety: Escape stairs and DCD approval.

Documents you will need

  • Trade licence and tenancy contract (Ejari)
  • Landlord or building management NOC
  • Unit plans
  • Drawings and stamped calculations
  • Fire safety drawings

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Check
Structural Solutions
Slab and existing structure.—
Design
Structural Solutions
Steel mezzanine with stamped calculations.Steel calculations
Approval
DM, DDA or Trakhees CED
Approval of the mezzanine.—
DCD
DCD
Fire safety approval.Warehouse DCD

Questions

Related questions

Who approves a mezzanine in JAFZA?

Trakhees CED.

Who approves it in Al Quoz?

Dubai Municipality.

Does a mezzanine add floor area?

It may; we check this for your unit.

What if a mezzanine was built without approval?

It can often be assessed and regularised.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.