Does a Mezzanine Need Civil Defence Approval in Dubai?
Yes. Every mezzanine in Dubai needs Dubai Civil Defence (DCD) approval, alongside the permit from the authority for the area.
Yes. Every mezzanine needs Dubai Civil Defence approval, in a warehouse, office, shop, restaurant or villa. A mezzanine adds floor area and people, and changes escape routes, sprinkler and fire alarm coverage, so fire safety drawings go to DCD with the mezzanine submission. DCD inspects at the end, before the completion.
What you need to know
- Escape routes: Stairs and exits from the mezzanine.
- Sprinklers and alarm: Coverage under and above the mezzanine.
- Final inspection: DCD inspects before completion.
- Together: With the authority permit and the landlord NOC.
Documents you will need
- Trade licence and tenancy contract, or title deed for owners
- Landlord, building management or master developer NOC
- Existing or as-built drawings of the unit or villa
- Mezzanine drawings with stamped structural calculations
- Fire safety drawings for Civil Defence
By situation
Your mezzanine
We confirm the route for your building and area.
| Situation | Approval route | Guides |
|---|---|---|
| Warehouse DCD plus area authority | Storage and escape. | Warehouse |
| Office or shop DCD plus area authority | Fit-out route. | Office |
| Restaurant DCD plus area authority | Seating and escape. | Restaurant |
| Villa DCD plus developer and authority | Villa route. | Villa |
How it works
How we get your mezzanine approved
1. Site and slab review
The unit, the existing slab and columns, and what the mezzanine is for.
2. Existing drawings
From the landlord, developer or authority; if missing or out of date, we survey and draw as built.
3. Design and calculations
Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.
4. NOC
Landlord, building management or master developer NOC.
5. Permit and Civil Defence
The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.
6. Build, inspect, complete
The mezzanine is built as approved, inspected, and the completion certificate is issued.
Who does what
Who approves a mezzanine
Landlord or developer
Gives the NOC for the mezzanine. It comes first.
Authority for the area
Dubai Municipality, DDA, Trakhees, DSO Authority, Dubai South Authority or DMCC approves the structure with stamped calculations.
Who approves? →Approved steel contractor
A steel mezzanine needs the stamp of an approved steel contractor (also called a steel specialist).
Steel contractor stamp →Dubai Civil Defence
Every mezzanine needs DCD approval for fire safety and escape.
Civil Defence and mezzanines →What we prepare
- Fire safety drawings
- Mezzanine drawings and calculations
Why mezzanine submissions get returned
- Mezzanine built before approval
- No landlord or developer NOC
- Drawings that do not match the unit as built
- Slab and columns not checked for the new loads
- Steel without the approved steel contractor stamp
- Added floor area not shown
- No Civil Defence fire safety drawings
Questions
Questions owners and tenants ask
Does every mezzanine need DCD approval?
Yes.
Is DCD approval enough on its own?
No, the authority for the area and the landlord NOC are needed too.
Does DCD inspect the mezzanine?
Yes, before the completion.