Mira Oasis · PMO OnePermit

PMO NOC in Dubai: the PMO OnePermit for works in Mira Oasis

A PMO NOC in Dubai usually means the PMO OnePermit: the permit that allows your contractor to work on site in Mira Oasis 1, 2 and 3 and issues the gate pass. It comes after the Al Aryam NOC, and major modifications also need the DDA permit. We manage all three for you.

The short answer

In Mira Oasis 1, 2 and 3, modification works go through three approvals. First, the Al Aryam NOC, which is mandatory for any modification in Mira and Mira Oasis. Second, for major modifications such as extensions and structural changes, the Dubai Development Authority (DDA) permit. Third, the PMO OnePermit, which allows your contractor to carry out the works on site and issues the gate pass. Without the PMO permit, the contractor cannot start.

CoversMira Oasis 1, 2 and 3
PurposeContractor work permit and gate pass
Before itAl Aryam NOC (mandatory)
Major worksDDA permit as well
PMO NOC and OnePermit for villa works in Mira Oasis Dubai

Official sources: PMO Consultancy · PMO OnePermit portal · Dubai Development Authority

Structural Solutions is an independent engineering consultancy and is not part of PMO, Al Aryam or Emaar.

PMO NOC in Dubai: what it covers

  • Work permit: Allows the contractor to carry out the works on site
  • Gate pass: Access for the contractor's team and vehicles
  • Minor works: Al Aryam NOC, then the PMO permit
  • Major works: Al Aryam NOC, DDA permit, then the PMO permit
  • Extensions and structural: Always need the DDA permit too
  • Tenants: Need the landlord's written consent first

Documents you will need

  • Title deed and owner's passport or Emirates ID
  • Approved Al Aryam NOC
  • Approved drawings (and the DDA permit for major works)
  • Contractor's trade licence and details
  • Landlord's written consent, if you are a tenant

By type of work

Which approvals your works need

In Mira Oasis 1, 2 and 3.

WorksApproval routeGuides
Minor works (for example pergola, painting, shade)
Al Aryam → PMO
Al Aryam NOC, then the PMO OnePermit for the contractor.Pergola
Car shade
Major works (extension, wall removal, structural)
Al Aryam → DDA → PMO
Al Aryam NOC, the DDA permit, then the PMO OnePermit.Extension
Wall removal
Swimming pool
Al Aryam → DDA → PMO
Al Aryam NOC, the DDA permit, then the PMO OnePermit.Pool

How it works

How the PMO permit fits in

1. Scope

We check what you want to change and which approvals it needs.

2. Drawings

Drawings and stamped structural calculations.

3. Al Aryam NOC

Mandatory for any modification in Mira Oasis.

4. DDA permit

For major modifications.

5. PMO OnePermit

Registered on the portal with the contractor's details.

6. Gate pass

The contractor gets site access and starts the works.

7. Completion

Completion and sign-off of the approved works.

What holds up the PMO permit

  • No Al Aryam NOC yet
  • Major works without the DDA permit
  • Contractor documents missing or expired
  • Works different from the approved drawings
  • Works started before the permit

Working in Mira Oasis?

Get your Al Aryam NOC and PMO permit handled

Send us three things on WhatsApp:

  1. Your community (Mira Oasis 1, 2 or 3) and villa number
  2. Photos of the area you want to change
  3. What you want to do

We reply with the approvals your works need, prepare the drawings and take you through Al Aryam, DDA and the PMO permit.

Questions

PMO NOC in Dubai: questions

What is a PMO NOC in Dubai?

People usually mean the PMO OnePermit: the work permit that lets your contractor carry out works on site and get the gate pass. In Mira Oasis 1, 2 and 3 it is issued through PMO's OnePermit portal.

What is PMO?

PMO Consultancy is a project and community management consultancy with its own office in Dubai. It manages the work permits for Mira Oasis 1, 2 and 3.

What is PMO OnePermit?

OnePermit is PMO's online portal for property modification works. The request is registered there and, once approved, the contractor can work on site and receives the gate pass.

Which communities does PMO cover?

At the moment, Mira Oasis 1, 2 and 3. For other communities, the developer or community management issues its own permits.

Is the PMO permit the same as the Al Aryam NOC?

No. The Al Aryam NOC approves the modification itself and is mandatory for works in Mira and Mira Oasis. The PMO OnePermit allows the contractor onto site to carry out the approved works.

Do I need the Al Aryam NOC before the PMO permit?

Yes. The Al Aryam NOC approves what you want to build; the PMO permit then allows the works to start on site.

Do I need a DDA permit as well?

For major modifications, yes. Extensions, structural changes and similar works need the Dubai Development Authority (DDA) permit in addition to the Al Aryam NOC.

What is a gate pass?

The pass that lets your contractor's team and vehicles into the community for the works. It comes with the PMO OnePermit.

Can my contractor start work without the PMO permit?

No. Without the PMO OnePermit the contractor cannot work on site or get the gate pass.

Who applies on PMO OnePermit?

The request is registered on the OnePermit portal with the owner's and contractor's details. We help you prepare the documents and manage the process.

Which works need a PMO permit?

Any modification works carried out on site in Mira Oasis 1, 2 and 3, from small exterior works to extensions. We check your scope and tell you exactly what it needs.

What documents are needed?

Usually the title deed, owner's passport or Emirates ID, the approved Al Aryam NOC, the approved drawings and the contractor's trade licence. We confirm the list for your scope.

Does a tenant need the owner's consent?

Yes. A tenant needs the landlord's written consent before applying for any NOC or permit.

What happens if works start without approval?

Works can be stopped and may have to be regularised or removed. We prepare as-built drawings and apply to clear it.

Do you work for PMO?

No. Structural Solutions is an independent engineering consultancy. We prepare the drawings and calculations and manage the Al Aryam, DDA and PMO steps for the owner.