Selling a Mira or Mira Oasis Home With Modifications

Selling a modified home in Mira or Mira Oasis? Check that each change had its Al Aryam NOC and, where needed, DDA approval. Unapproved works can hold up a sale.

The short answer

Before you sell a home in Mira or Mira Oasis, check each modification against its approvals: the Al Aryam NOC, any DDA approval, and the completion papers. Unapproved works can hold up a sale. If papers are missing, we survey the home and advise on the route. The master developer can give the as-built drawings, or we obtain them on your behalf.

CheckEach modification
PapersNOC and any DDA approval
If missingWe survey and advise

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Compare: Check the home against the approved drawings.
  • Earlier owners: Their works still need to be checked.
  • Before listing: Leave time to deal with anything missing.
  • Buyers: May ask for the approvals.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Do I need an Al Aryam NOC to sell?

Check first that your modifications have their approvals.

What if an earlier owner made changes?

We check them and advise.

Where do I get the drawings?

From the master developer, or we obtain them on your behalf.

Can you help before listing?

Yes, send us photos and any papers you have.