Mira and Mira Oasis As-Built Drawings

As-built drawings for Mira and Mira Oasis can come from the master developer, or we obtain them on the owner’s behalf.

The short answer

As-built drawings for a home in Mira or Mira Oasis can be given by the master developer. Otherwise, we obtain them on the owner’s behalf. If the home has changed, we can survey it and redraw the plans, in PDF or CAD. They are the base for any NOC, DDA application or sale.

SourceThe master developer
OtherwiseWe obtain them
FormatsPDF or CAD

Mira and Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Changed homes: A survey shows what was built.
  • Before design: Avoids surprises on walls and columns.
  • Selling: Helps show what was approved.
  • Owner letter: We may need your authorisation.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

The master developer can give as-built drawings, or we obtain them on your behalf. We prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Who issues the NOC? →
🏛️

Dubai Development Authority (DDA)

Approves major works, including changes to partitions, after the Al Aryam NOC.

Do I need DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Where do I get drawings?

The master developer, or we obtain them on your behalf.

What if they do not match?

We survey and redraw.

Can I get CAD?

Yes.

Is it the same in Mira Oasis?

Yes.