Dubai Hills · Emaar · Villa

Dubai Hills Villa Second Floor Addition

Dubai Hills villa second floor addition: adding a floor, or a room on the roof, needs an Emaar NOC and a Dubai Development Authority (DDA) building permit, and the existing structure must be checked first.

A second floor addition, or a new room on the roof, in Dubai Hills Estate needs a structural check of the existing foundations, columns and slabs, an Emaar NOC and a DDA building permit. The added area counts as gross floor area (GFA), and Emaar confirms its fees during the NOC application. Whether it can be approved depends on the villa, the plot and the community guidelines; there is no fixed figure we can promise in advance.

Developer NOCEmaar NOC
AuthorityDubai Development Authority (DDA)
PlansEmaar provides as-built plans
Dubai Hills villa second floor addition

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the Emaar as-built plans and on site, so the design matches what Emaar can approve.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Dubai Hills Estate
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

The approval route in Dubai Hills Estate

Dubai Hills Estate villas follow Emaar first, then the Dubai Development Authority (DDA) permit for structural works. We confirm the route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar Community Management
NOC. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Development Authority (DDA)
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Development Authority (DDA)
Inspections during and after the works; the order can vary.—
Completion
Dubai Development Authority (DDA)
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in Dubai Hills Estate

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Emaar as-built plans, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Development Authority (DDA) permit where the works are structural.

What each work needs in Dubai Hills Estate

  • Extension: Emaar NOC, Dubai Development Authority (DDA) permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Development Authority (DDA) permit
  • Balcony closure: Emaar NOC and Dubai Development Authority (DDA) permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Development Authority (DDA) permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask in Dubai Hills Estate

Can I add a floor to my Dubai Hills villa?

Sometimes. It depends on the villa, the plot, the community guidelines and whether the existing structure can carry the new load.

What approvals does it need?

An Emaar NOC, then a Dubai Development Authority (DDA) building permit with stamped structural drawings and calculations.

Does the added floor count as GFA?

Yes. Added floor area is reviewed as additional GFA by Emaar and the authority.

Can the existing foundations take another floor?

We check this first, from the Emaar as-built plans and on site. Some villas need strengthening; some can’t take the load.

How much does Emaar charge?

Emaar confirms its fees during the NOC application, based on the community guidelines.

Can I add a room on the roof instead of a full floor?

It is reviewed the same way: Emaar NOC, DDA permit and a structural check. A roof room must also keep the villa’s outside look acceptable to Emaar.

Last checked: November 2026. Official sources: Emaar · Dubai Development Authority · Dubai Municipality