Dubai Hills · Emaar

Can I Extend My Villa in Dubai Hills?

It depends on your villa, your plot and Emaar’s review, so each case is different. Ask us and we will advise on yours.

The short answer

It depends on your villa, your plot and Emaar’s review, so each case is different. Send us your villa type and what you would like to add, and we will advise on your case. If it can go ahead, the route is the Emaar NOC through the Community Portal, then a DDA building permit. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, and higher rates above 10%, subject to Emaar Management approval.

AnswerCase by case
RouteEmaar NOC, then DDA
Up to 10%AED 1,000 per sq ft

Extensions

What Emaar looks at for an extension

There is no single figure for Dubai Hills. Emaar reviews each case, so ask us and we will advise on your villa.

ItemWhat to expect
Size and locationDepends on your villa, your plot and Emaar’s review.
LookSame theme, materials, openings and colours as the villa.
StructureWorks must not damage structural elements. Our engineers check this first.
Added GFAEmaar charges on the added area. See the fee table.
Next stepSend us your villa type and idea, and we will advise on your case.

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Other ways to add space: Closing a rear balcony or filling a double-height space.
  • Plans: Emaar provides as-built plans, which we check on site.
  • Look: The extension matches the villa.
  • Townhouses: Usually less room. Ask us about your unit.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

Applied through the Emaar Community Portal.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Can I extend my villa?

It depends on your villa and Emaar’s review. Ask us and we will advise.

How much can I add?

There is no single figure. We look at your villa and plot first.

What does Emaar charge?

AED 1,000 per sq ft up to 10%, and higher rates above that, subject to Emaar Management approval.

What should I send you?

Your villa type, photos and your idea.

Related guides

Keep reading