Can I Open Up Walls Inside My Dubai Hills Villa?
Non-structural walls, yes. Load-bearing walls and precast panels need engineering, the Emaar NOC and a DDA permit.
It depends on the wall. Non-structural internal walls can be removed as long as the structure and waterproofing are not affected. If a wall carries load, or it is a precast panel, our engineers design the support with stamped calculations, and the work goes through the Emaar NOC and the DDA permit. That also covers new openings. The same applies in Golf Place, Maple, Sidra and Hills Grove. We check the as-built plans from Emaar and the wall on site.
Emaar’s rules
Internal works Emaar allows
These are allowed if they do not affect the structure or waterproofing. Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Finishes | Floor tiles, sanitary ware, internal painting and ceilings. |
| Joinery | Kitchen and bathroom cabinets, and wardrobes. |
| Bathroom | Bathtub to shower, or the reverse. |
| Walls | Removing non-structural internal walls. |
| Services | Minor electrical and plumbing works. |
| Contractor access | Contractors still need an Emaar entry permit to work in the community. |
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Open kitchens: The most common request.
- Precast panels: Common in Dubai Hills, and checked first.
- New openings: Treated the same way as removals.
- External walls: Follow the door and window rules.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I remove a wall?
A non-structural one, yes. Otherwise it needs design and approval.
How do I know?
We check the plans and the wall on site.
Do I need a DDA permit?
For structural works, after the Emaar NOC.
Can I make an opening instead?
Yes, under the same check.