Dubai Hills Villa As-Built Drawings: Plans for Your Villa
Dubai Hills villa as-built drawings come from Emaar, or from a site survey and redraw if the plans are missing or the villa has changed.
The short answer
Emaar provides the as-built plans for Dubai Hills villas. If they are missing or the villa has changed since, we survey it and redraw the plans. You can have them as PDF or CAD. As-built drawings are the base for any NOC, DDA permit or GFA measurement, and they help when buying or selling. This covers Golf Place, Sidra, Maple and every other part of Dubai Hills Estate.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Existing plans: We can obtain them for you.
- Changed villas: A survey shows what was actually built.
- Buying: Compare the villa with what was approved.
- Before design: Avoids surprises on walls and columns.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
Applied through the Emaar Community Portal.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Emaar
Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.
What is an Emaar NOC? →Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Where do I get my villa plans?
Emaar provides them to owners, and we can obtain them for you.
What if they do not match the villa?
We survey it and redraw the plans.
Can I get CAD files?
Yes, PDF or CAD.
Do you cover all Dubai Hills phases?
Yes.
Related guides
