Dubai Hills · Emaar

Dubai Hills Pergola NOC: Sizes, Distances and Approval

A Dubai Hills pergola needs an Emaar NOC. On a villa, keep it 1.2 m from the boundary, up to 2.7 m high, and 20 m² or 15% of the plot, subject to Emaar’s review.

The short answer

A pergola in Dubai Hills needs an Emaar NOC, and a DDA permit if it is a fixed structure. On a villa, Emaar’s rules keep it 1.2 m from the boundary, up to 2.7 m from floor level or up to 3 m if free-standing, and within 20 m² or 15% of the plot, whichever is less. On a townhouse, it sits 0.6 m from the boundary with up to 20 m² on standard plots. Sides stay open, and shades cannot be fixed to boundary walls. All of this is subject to Emaar’s review.

Villa1.2 m from boundary
Townhouse0.6 m from boundary
AreaUp to 20 m²

Emaar’s rules

Pergola, gazebo and shade sizes: villa vs townhouse

Emaar reviews every application, so these are subject to its review.

ItemVillaTownhouse
Pergola: from the boundary1.2 m0.6 m
Pergola: heightUp to 2.7 m from floor level. Attached: just above the lintel. Free-standing: up to 3 mFree-standing up to 2.5 m. Attached up to 2.7 m
Pergola: area20 m² or 15% of the plot, whichever is less20 m² on standard plots
Pergola: finishWood finish, brown or white, open sidesMatches existing pergolas, open sides
GazeboBackyard only, 1.2 m from the boundary, up to 3 mBackyard only, 0.6 m from the limits, up to 3 m, 20 m² on standard plots
Shade structure1.2 m from side and rear boundaries, up to 3 m, open0.6 m from side and rear boundaries, up to 3 m, open, not in front
Boundary wallsShades cannot be fixed to themShades cannot be fixed to them

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Open sides: Enclosing it adds GFA.
  • Finish: Wood finish, brown or white on villas.
  • Foundations: We design them away from the boundary wall.
  • Boundary walls: Shades cannot be fixed to them.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

Applied through the Emaar Community Portal.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

How close can a pergola be to the boundary?

1.2 m on a villa and 0.6 m on a townhouse.

How high can it be?

Up to 2.7 m, or 3 m if free-standing on a villa. Townhouses: 2.5 m free-standing and 2.7 m attached.

Do I need a DDA permit?

For a fixed structure, after the Emaar NOC.

Can I enclose it later?

That adds GFA and needs a new review.