Dubai Hills Balcony Closure NOC: Rear Balconies and Glazing
A Dubai Hills balcony closure needs an Emaar NOC. Rear balconies can be closed, emaar reviews front balconies case by case, and the closure adds GFA.
The short answer
Under Emaar’s rules, a rear balcony with a roof can be closed with non-reflective glass, clear glass or block wall. A rear balcony without a roof can be closed with a new concrete roof and a matching parapet, subject to approval. Emaar reviews front balconies case by case. The closure adds GFA, so Emaar charges on the added area. It needs an Emaar NOC, and structural work needs a DDA permit. All of this applies across Dubai Hills, subject to Emaar’s review.
Emaar’s rules
Enclosure rules: patio, balcony, terrace and voids
Emaar reviews these as added area, and every application is subject to its review.
| Item | What to expect |
|---|---|
| Patio | Allowed if the external elevation does not change. On the front, keep the arch: windows and doors sit flush with its inner edge. |
| Courtyard | Only an open courtyard at G+1 level, within the building line, with a matching parapet. |
| Rear balcony with a roof | Can be closed with non-reflective glass, clear glass or block wall. |
| Rear balcony without a roof | Can be closed with a new concrete roof and a parapet level with the existing one, subject to approval. |
| Front balcony | Emaar reviews it case by case: ask us about your villa. |
| Inaccessible terrace | On the rear or side, it can become living space, matching the villa. |
| Main door | Can move only onto an existing slab, and must not block a window or vent. |
| Void or double-height space | Allowed with structural approval before works: independent columns, or bolted steel beams subject to Emaar and authority approval. |
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Glass or solid: Non-reflective glass, clear glass or block wall on a rear balcony.
- Matching: Frames, colours and parapets match the villa.
- Slab check: We confirm the balcony slab can take the load.
- Sub-communities: The same route applies in Sidra, Maple, Golf Place and Hills Grove.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
Applied through the Emaar Community Portal.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Emaar
Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.
What is an Emaar NOC? →Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I close my balcony in Dubai Hills?
A rear balcony, yes. Emaar reviews front balconies case by case.
Glass or block wall?
Either on a rear balcony: non-reflective glass, clear glass or block wall.
Does it add GFA?
Yes, and Emaar charges on the added area.
Do I need a DDA permit?
For structural work, after the Emaar NOC.
Related guides