Can I Extend My Townhouse in Al Aryam?
Extensions are possible, but each case is different. Ask us about your home in Mira or Mira Oasis, and we will advise.
The short answer
Extensions are allowed in Mira and Mira Oasis, but each case is different, and it is all subject to the submission and approval. For example, closing a terrace in Mira Oasis is doable and has been done before. Send us your home type and your idea, and we will advise on your case. An extension needs the Al Aryam NOC, then DDA approval, and work near shared walls needs careful structural design.
Mira Oasis
Mira and Mira Oasis guides
Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.
What you need to know
- Terraces: A common request, and doable subject to approval.
- Shared walls: Designed and calculated to protect both homes.
- Drawings: The master developer can give as-built drawings, or we obtain them on your behalf.
- Next step: Send us your home type and idea.
Documents you will need
- Scope of works
- Proposed drawings
- Owner documents
- Other documents, if the reviewing team asks for them
How it works
How it works
1. Scope
You tell us what you want to change.
2. Drawings
We obtain the as-built drawings from the master developer, or on your behalf, and prepare the proposed drawings.
3. Al Aryam NOC
We get in touch with the Al Aryam engineering team and obtain the NOC.
4. DDA
Major works, including partition changes, go to DDA. For very minor works, we review and advise.
5. Gate pass
Your contractor gets the gate pass to work on site.
Who does what
Who is involved
Al Aryam
Its engineering team reviews the application and issues the NOC directly.
Al Aryam NOC guide →Dubai Development Authority (DDA)
Issues the permit for major works, after the Al Aryam NOC.
Is Al Aryam under DDA? →Structural Solutions
An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.
Al Aryam NOC guide →What can hold up an application
- Scope of works not clear
- Proposed drawings incomplete
- Owner documents missing
- The reviewing team asks for more documents
Questions
Questions owners ask
Can I extend my townhouse?
Each case is different. Ask us and we will advise.
Can I close my terrace?
In Mira Oasis, yes, subject to submission and approval.
Who approves it?
Al Aryam issues the NOC, then DDA approves major works.
Is it the same in Mira?
The route is the same in both.