Al Furjan · Nakheel · Trakhees · Updated November 2026

Al Furjan Villa Modification NOC: Nakheel NOC, Trakhees Permit and Fees

An Al Furjan villa modification NOC comes from Nakheel, then Trakhees issues the building permit. The Nakheel NOC fee is AED 5,250 for works without a swimming pool and AED 15,750 with a pool. Trakhees takes an AED 2,500 security deposit and a permit fee of about AED 1,500 to 3,000. Extensions stay within the villa footprint, with setbacks of at least 1.2 m.

Villa modifications and extensions in Al Furjan need a Nakheel NOC. Works that change the structure also need a Trakhees building permit, with drawings and stamped structural calculations. An extension that adds built-up area is charged at about AED 1,400 per sq ft at the current rate. Interior painting needs no NOC. Unapproved works on the Villa Status Report (VSR) need to be cleared before new approvals or a sale.

1. Nakheel NOCAED 5,250, or AED 15,750 with a swimming pool
2. Structural analysisDrawings and stamped calculations by our engineers
3. Trakhees permitAbout AED 1,500 to 3,000, plus AED 2,500 deposit

Fees and fines

Al Furjan villa modification NOC fees, deposits and fines

Official fees as of November 2026. Nakheel and Trakhees set these and can change them. Our engineering fee is separate and quoted after we review your villa.

ItemAmountNotes
Nakheel NOCAED 5,250Works without a swimming pool.
Nakheel NOC with a swimming poolAED 15,750When the works include a pool.
Added built-up areaAbout AED 1,400 per sq ftCurrent rate for extensions that add area.
Nakheel security depositNoneNakheel does not take a deposit.
Trakhees security depositAED 2,500Paid for the Trakhees permit.
Trakhees permit feeAbout AED 1,500 to 3,000Varies with the scope of works.
Fine for works without approvalAED 2,000 to 10,000Up to AED 50,000 in some cases.

Approvals

Required approvals and permits in Al Furjan

Who issues each approval and when it applies.

ApprovalWho issues itWhen it is needed
Nakheel NOCNakheel (master developer)Any modification or extension outside, structural works and garden structures.
Stamped structural calculationsOur engineersExtensions, wall removal, slab openings, pools, pergolas and shades.
Trakhees building permitTrakheesStructural works, after the Nakheel NOC. Submitted by an approved consultant.
Pool environmental NOCDubai Municipality Environment DepartmentSwimming pools. Pool environmental NOC
CompletionTrakheesFinal inspection and completion certificate. Completion certificate

Limits

Al Furjan villa extension rules

The limits that shape most designs in Al Furjan. Nakheel reviews every application.

RuleLimit
ExtensionsWithin the villa footprint.
SetbacksNot less than 1.2 m.
Car parking shadeNot more than 35 m².
TownhousesThe design must take the shared wall into account; building next to it needs the neighbour’s consent.

By type of work

Al Furjan villa works and their approvals

Every row follows the Nakheel NOC and Trakhees route. Open a guide for the details.

WorkWhat appliesGuide
Ground-floor extensionWithin the footprint; added area charged per sq ft.Ground-floor extension
First-floor extensionWithin the footprint; stamped calculations.First-floor extension
Maid roomTreated as an extension, within the villa footprint.Maid room
Garage conversionNakheel NOC, then Trakhees.Garage conversion
Swimming poolNakheel NOC AED 15,750, Trakhees permit, pool environmental NOC.Swimming pool NOC
PergolaSetbacks not less than 1.2 m.Pergola NOC
Car parking shadeNot more than 35 m².Car shade
Removing or opening wallsEngineer checks if load-bearing first.Wall removal NOC
Balcony closureNakheel NOC, then Trakhees where structural.Balcony closure
Solar panelsNakheel NOC, then Trakhees where structural.Solar panel NOC
Exterior paintingNakheel NOC; interior painting needs none.Painting NOC
Boundary wall or gateNakheel NOC, then Trakhees where structural.Boundary wall
Home liftSlab openings, shaft and pit: structural.Lift NOC
Driveway and plot accessNakheel plot access NOC plus RTA steps.Plot access NOC

Official sites: Nakheel · Trakhees · Dubai Municipality

What you need to know in Al Furjan

  • The community: Al Furjan has villas and townhouses, including Murooj Al Furjan, Tilal Al Furjan, Masakin and Al Furjan West.
  • Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
  • VSR: Existing unapproved works on the Villa Status Report can hold a new request until they are cleared.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

How it works

How to get an Al Furjan villa modification NOC

1. Villa check

We check the villa plans, the VSR and your idea against the rules.

2. Drawings and calculations

Drawings and stamped structural calculations, in PDF and AutoCAD where asked.

3. Nakheel NOC

We apply for you. AED 5,250, or AED 15,750 with a pool.

4. Added area

For extensions, built-up area at about AED 1,400 per sq ft.

5. Trakhees permit

Submitted by the approved consultant. AED 2,500 deposit plus the permit fee.

6. Works and completion

Built to the approved drawings, then final inspection and completion certificate.

Already done

What if works were done without approval?

Built works take an as-built route, not the new works NOC route. Fines for works without approval range from AED 2,000 to AED 10,000, and can reach AED 50,000 in some cases. Unapproved works also show up on the Villa Status Report (VSR).

Contact us and we will help you accordingly. See VSR clearance in Al Furjan and selling with unapproved changes.

Who does what

Who approves works in Al Furjan

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Structural calculations →

What we handle

  • Villa check and VSR review
  • Drawings and stamped structural calculations
  • Nakheel NOC
  • Trakhees building permit
  • Completion certificate

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Extension outside the villa footprint or inside the setback
  • Missing owner documents

Questions

Questions owners ask about Al Furjan

Is Al Furjan under Trakhees?

Yes. Villa works in Al Furjan need a Nakheel NOC, then a Trakhees building permit.

How much is the Nakheel NOC fee in Al Furjan?

AED 5,250 for works without a swimming pool, and AED 15,750 when the works include a pool.

What are the Trakhees fees for a villa permit in Al Furjan?

Trakhees takes an AED 2,500 security deposit, and the permit fee is about AED 1,500 to 3,000, depending on the scope.

Does Nakheel take a security deposit?

No. The AED 2,500 deposit is paid to Trakhees.

What is the built-up area charge for an extension in Al Furjan?

Extensions that add built-up area are charged at about AED 1,400 per sq ft at the current rate.

How big can my Al Furjan villa extension be?

Extensions stay within the villa footprint, and setbacks must be at least 1.2 m. Our engineers check your plot and villa plans first.

How big can a car parking shade be in Al Furjan?

Not more than 35 m².

What is the fine for works without approval in Al Furjan?

Fines range from AED 2,000 to AED 10,000, and can reach AED 50,000 in some cases.

Which villa works in Al Furjan need approval?

Works that change the structure, the outside of the villa, the garden structures or the services need a Nakheel NOC, and structural works also need a Trakhees permit. Interior painting needs no NOC.

Can I remove a wall inside my Al Furjan villa?

Only after an engineer checks whether it is load-bearing. Wall removal needs a Nakheel NOC, and a Trakhees permit with stamped calculations where the wall is structural.

Where do I get my villa plans?

Nakheel provides villa plans to owners. If they are missing or the villa has changed, we survey it and prepare as-built drawings.

What if the previous owner made changes without approval?

They show up on the Villa Status Report (VSR). Built works take an as-built route, and a fine may apply. Contact us and we will help you accordingly.

Can I extend a townhouse in Al Furjan?

Townhouses follow the same route. The design must take the shared wall into account, and building next to a shared wall needs the neighbour’s consent.

Who can help with an Al Furjan villa modification NOC?

Structural Solutions checks your villa, prepares drawings and stamped calculations, and applies for the Nakheel NOC and the Trakhees permit. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.