An Al Furjan villa lift needs a Nakheel NOC, then a Trakhees building permit. A lift means a new shaft, openings in the slabs and usually a pit, so the application needs drawings and stamped structural calculations, not only the lift supplier’s drawings.
Last checked: November 2026. Official sources: Nakheel · Trakhees
More owners are adding a home lift, often for a parent who can no longer use the stairs. In an Al Furjan villa this is a structural change, so it follows the Nakheel and Trakhees route like an extension.
Who approves a villa lift in Al Furjan
- Nakheel: NOC.
- Trakhees: building permit for the structural works.
Why a lift is a structural project
- Slab openings at each floor, with new beams or trimming around them
- The shaft: concrete, masonry or a steel structure
- The pit below the lowest stop, which can affect foundations and waterproofing
- Loads from the lift onto the structure
Steel shafts and frames need an approved steel contractor or specialist stamp. Supplier drawings alone are not enough for the permit.
The steps
- Get the villa plans from Nakheel, or survey the villa if they are missing.
- Choose the lift position with the structure in mind.
- Prepare the architectural drawings and stamped structural calculations.
- Apply for the Nakheel NOC.
- Apply for the Trakhees permit.
- Install, then final inspection and completion.
More on Nakheel villa lift NOCs and Trakhees villa lift approval.
Questions owners ask
Do I need approval to install a lift in my Al Furjan villa?
Yes. A Nakheel NOC, then a Trakhees building permit, because the lift changes the structure.
Is it under Dubai Municipality or DDA?
No. Al Furjan villa works follow the Nakheel NOC and Trakhees permit route.
Can the lift supplier’s drawings be used for the permit?
Not on their own. The application needs drawings and stamped structural calculations for the slab openings, shaft and pit.
Does a steel lift shaft need anything extra?
Yes. Steel works need an approved steel contractor or specialist stamp.