Nakheel · Al Furjan

Al Furjan Villa Extension NOC

A Al Furjan villa extension NOC is Nakheel’s approval to add space to your villa. You apply, then the extension needs a Trakhees building permit. We prepare the drawings and stamped calculations and handle both.

To extend a villa in Al Furjan you need a Nakheel NOC, then a Trakhees building permit with drawings and stamped structural calculations. Nakheel does not publish fixed extension figures; it reviews each design against the villa plans, and charges on the added GFA plus an application fee. Unapproved works on the Villa Status Report (VSR) need to be fixed before a sale.

Developer NOCNakheel NOC
Building permitTrakhees
ChargesOn added GFA + application fee

What you need to know in Al Furjan

  • The community: Al Furjan has villas and townhouses. Townhouse designs must take the shared wall into account.
  • Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
  • VSR: Existing unapproved works can hold a new request until they are cleared.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

By type of work

Al Furjan villa works and their approvals

Every row follows the Nakheel NOC and Trakhees route. Open a guide for the details in Al Furjan.

WorkApproval routeGuides
Extensions
Nakheel → Trakhees
Nakheel NOC, then the Trakhees permit where structural.Can I Extend My Villa in Al Furjan?
Extra bedroom
Nakheel → Trakhees
Nakheel NOC, then the Trakhees permit where structural.Can I Add a Ground-Floor Bedroom for My Parents in Al Furjan?
Maid room
Nakheel → Trakhees
Nakheel NOC, then the Trakhees permit where structural.Can I Build a Maid Room in My Al Furjan Garden?
Room on the roof or upper floor
Nakheel → Trakhees
Nakheel NOC, then the Trakhees permit where structural.Can I Build a Room on My Al Furjan Roof?
Garage conversion
Nakheel → Trakhees
Nakheel NOC, then the Trakhees permit where structural.Can I Convert My Garage Into a Room in Al Furjan?
Balcony closure
Nakheel → Trakhees
Nakheel NOC, then the Trakhees permit where structural.Can I Close My Balcony in Murooj Al Furjan?
Home lift
Nakheel → Trakhees
Structural: slab openings, shaft and pit.My Parent Can’t Use the Stairs: Can I Add a Lift in Tilal Al Fu…
VSR and unapproved works
Nakheel → Trakhees
Unapproved works show up in the VSR and need fixing before a sale.Al Furjan Unapproved Extension Regularisation
Sign-off and completion
Nakheel → Trakhees
Final inspection and completion certificate close the permit.Al Furjan Villa Extension Sign-Off

How it works

How to get a Al Furjan villa extension NOC

1. Villa plans

From Nakheel, or we survey the villa and draw it as built.

2. Design check

We check the idea against the villa plans and the structure.

3. Drawings and calculations

Drawings and stamped structural calculations, in PDF and AutoCAD where asked.

4. Nakheel NOC

Submitted.

5. Trakhees permit

Submitted by the approved consultant for structural works.

6. Works and sign-off

Built to the approved drawings, then final inspection and completion certificate.

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Nakheel extension NOC →

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask about Al Furjan

Is Al Furjan under Trakhees?

Yes. Villa works in Al Furjan need a Nakheel NOC, then a Trakhees building permit.

Do I need Nakheel approval to extend my Al Furjan villa?

Yes. The extension needs a Nakheel NOC first, then a Trakhees building permit with drawings and stamped structural calculations.

How much can I extend my Al Furjan villa?

Nakheel does not publish fixed figures for owners. It reviews each design against the villa plans, so we check your idea before submitting.

Where do I get my villa plans?

Nakheel provides villa plans to owners. If they are missing or the villa has changed, we survey it and prepare as-built drawings.

What if the previous owner made changes without approval?

They show up in the Villa Status Report (VSR) and need to be fixed before a sale. Some can be approved after review; others need changing or removing.

How does Nakheel charge for an extension?

On the added GFA, plus an application fee. There is no fixed price list; the Nakheel team sends the final invoice.

Can I extend a townhouse in Al Furjan?

Townhouses follow the same route. The design must take the shared wall into account, and building next to a shared wall needs the neighbour’s consent.

Related guides

Keep reading