Nakheel · Al Furjan

I Just Bought a Villa in Al Furjan: What Can I Change?

A lot, with approval. Al Furjan has townhouses and villas in several styles between Sheikh Zayed Road and Jebel Ali. Owners add rooms, pools, pergolas and open kitchens. Each change needs the Nakheel NOC first, then the Trakhees permit for structural works.

What New Owners Usually Do

Al Furjan has both townhouses and villas, so plot sizes and options vary. Popular changes are open kitchens, an extra room, a pool, garden shade and a facade refresh.

Nakheel NOCVia the Nakheel portal
Villa PlansProvided by Nakheel
Trakhees PermitFor structural works

What you need to know

  • Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
  • VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

At a glance

I Just Bought a Villa in Al Furjan: What Can I Change? at a glance

Who does what, step by step.

WhoApproval routeGuides
You and our engineers
Step 1
Your idea, photos and plot details. We get the villa plans from Nakheel and check them against what is built.—
Nakheel
Step 2
Reviews the design against its community rules and issues the NOC.—
Trakhees
Step 3
Building permit for structural works.—
Nakheel and Trakhees
Step 4
Inspections and completion.—

How it works

How It Works in Al Furjan

Your Idea, Photos and Plot Details

Villa Plans From Nakheel

Sketch and Early Check

Drawings and Structural Calculations

Nakheel NOC

Trakhees Permit, Works and Completion

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

What Al Furjan Owners Ask Us About

  • Open Kitchen
  • Extra Room
  • Pool
  • Pergola
  • Majlis
  • Facade Refresh

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

What can I change in my Al Furjan villa?

Most things, with the Nakheel NOC and the Trakhees permit.

Who approves changes to my Al Furjan villa?

Nakheel issues the NOC, then Trakhees issues the building permit for structural works.

Do I need full drawings to ask if my idea is possible?

No. Photos and a simple sketch are enough for us to give you an early answer.

Can I get the plans of my villa?

Yes. Nakheel can provide the villa plans. Check them against what is built before design starts.

Related guides

Keep reading