Can I Close My Balcony in Al Furjan?

Possibly. Closing a balcony or terrace adds floor area and changes the outside, so Nakheel reviews it like a small extension. Frames and glass must match the villa.

Counts as Area

An enclosed balcony becomes floor area.

Nakheel NOCAED 5,250, or 15,750 with a pool
Villa PlansProvided by Nakheel
Trakhees PermitFor structural works

What you need to know

  • Style: Window frames, glass and roof must match the villa and the community.
  • Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
  • VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

At a glance

Can I Close My Balcony in Al Furjan? at a glance

Who does what, step by step.

WhoApproval routeGuides
You and our engineers
Step 1
Your idea, photos and plot details. We get the villa plans from Nakheel and check them against what is built.—
Nakheel
Step 2
Reviews the design against its community rules and issues the NOC.—
Trakhees
Step 3
Building permit for structural works.—
Nakheel and Trakhees
Step 4
Inspections and completion.—

How it works

How It Works in Al Furjan

Your Idea, Photos and Plot Details

Villa Plans From Nakheel

Sketch and Early Check

Drawings and Structural Calculations

Nakheel NOC

Trakhees Permit, Works and Completion

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

What Al Furjan Owners Ask Us About

  • Balcony Enclosure
  • Terrace Room
  • Sunroom
  • Glass Enclosure
  • Covered Terrace
  • Winter Garden

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Can I enclose my balcony in Al Furjan?

Possibly, as added area with Nakheel approval.

Who approves changes to my Al Furjan villa?

Nakheel issues the NOC, then Trakhees issues the building permit for structural works.

Do I need full drawings to ask if my idea is possible?

No. Photos and a simple sketch are enough for us to give you an early answer.

Can I get the plans of my villa?

Yes. Nakheel can provide the villa plans. Check them against what is built before design starts.