Nakheel · Al Furjan

Al Furjan Villa As-Built Drawings

We prepare as-built drawings for Al Furjan villas, showing the villa exactly as it stands today. They are needed when original drawings are missing, after past modifications, before new Nakheel NOC or Trakhees applications, and before selling.

Why Al Furjan Owners Need As-Built Drawings

Many Al Furjan villas have been changed since handover — extensions, enclosed areas, removed walls, pools and pergolas. New applications to Nakheel and Trakhees need drawings that match what is actually on site, so the starting point is an accurate as-built set. Planning a villa extension in Al Furjan as well? See our main guide for the full Nakheel NOC and Trakhees permit process.

Site SurveyOur own team
Authority FormatDM, DDA, Trakhees
PDF + DWGReady to submit

What you need to know

  • Drawn to Trakhees Requirements: Building permits in Al Furjan are handled by Trakhees, after the Nakheel NOC. We prepare the as-built drawings in AutoCAD to Trakhees CED format, so they can be used directly for the next application.
  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

At a glance

Al Furjan Villa As-Built Drawings at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Surveys the site and prepares drawings to the format of the developer and the authority.—
Nakheel (master developer)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

How We Prepare Your Drawings

Site Visit & Measured Survey

Existing Documents Reviewed

AutoCAD Drafting

Engineer Review

Stamped Drawings Issued

Submission Support

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC through its online portal.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

When Al Furjan Owners Call Us

  • Original Drawings Missing
  • Before a New Extension
  • After Unapproved Works
  • Before Selling the Villa
  • For Regularisation
  • For Completion Certificate

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Do I need as-built drawings for my Al Furjan villa?

If the original drawings are missing or the villa has been modified, yes — before new applications or a sale.

Who reviews drawings in Al Furjan?

Nakheel for the NOC, then Trakhees for building permits.

What format are the drawings in?

AutoCAD, prepared to Trakhees CED format.

Do you visit the villa?

Yes, we carry out a measured survey on site.

Can the drawings be used for a new application?

Yes, they are prepared as the base for your next submission.

Related guides

Keep reading