How Much Does a Balcony Closure Cost in The Springs?
Closing a balcony to gain a bigger bedroom or a small study is common in Springs townhouses. The price depends on how it is closed and Emaar counts a closed balcony as new floor area.
A balcony closure in The Springs is usually a smaller job than a ground floor extension: a glass or aluminium closure generally costs less than building masonry walls, and the balcony slab is already there. Built as a room, use about AED 800 to 1,500 per sq ft as the upper guide. Closing a balcony adds floor area, so Emaar’s AED 1,000 per sq ft fee for Springs townhouses applies. It also needs the Emaar NOC, because Emaar reviews the look from the street. We check your balcony and prepare the drawings to price.


Options
Glass or masonry: what changes
Typical market ranges in Dubai, November 2026. Your own price is set once contractors price the drawings for your home.
| Option | Typical cost | Notes |
|---|---|---|
| Glass or aluminium closure | Usually the lower-cost option | Must match the villa’s look; Emaar reviews it |
| Masonry walls with windows | Up to about AED 800 to 1,500 per sq ft | Adds load on the slab, so we check the structure |
| Example: 60 sq ft balcony closed as a room | AED 48,000 to 90,000 for the works | Plus AED 60,000 Emaar floor area fee (60 sq ft x AED 1,000) |
What changes the price
What pushes the cost up or down
| Factor | Effect |
|---|---|
| Glass or masonry | Masonry adds weight and cost |
| Structure | The slab must carry the new walls |
| AC and electrics | Joining the room to the bedroom |
| Look from the street | Emaar asks it to match the villa |
Official fees
Official fees on top of the works (November 2026)
Emaar and Dubai Municipality set these and can change them.
| Item | Fee |
|---|---|
| Emaar NOC | AED 2,000 total, including the AED 500 submission fee |
| Emaar added floor area (GFA) fee, Springs townhouses | AED 1,000 per sq ft of new floor area, within the 10% allowance |
| Emaar security deposit | AED 10,000, refunded after clearance of the job |
| Dubai Municipality permit | Approx. AED 1,000 to 2,000 |
| Emaar fine for works without NOC and permits | AED 10,000 to 50,000 |
All costs
Springs cost guides
| Work | Guide |
|---|---|
| Kitchen extension | kitchen extension cost |
| Study room | study room cost |
| Internal renovation | internal renovation cost |
| Back terrace extension | back terrace extension cost |
| Balcony closure | balcony closure cost |
| All costs in one place | Springs extension and renovation costs |
Official sites: Dubai Municipality
What you need to know
- Glass closure: usually the lower-cost option.
- Masonry room: up to about AED 1,500/sq ft.
- Emaar NOC always needed.
- Floor area fee: AED 1,000/sq ft.
Documents you will need
- Photos of the balcony inside and outside
- Villa type and number
- Title deed
- Your idea
How it works
How to price your balcony closure
1. Photos
Send the balcony.
2. Check
Slab and look.
3. Design
Drawings to price.
4. Quotes
Contractors price it.
5. Approvals
Emaar and DM.
6. Works
Closure built.

Questions
Springs balcony closure cost: questions
How much does a balcony closure cost in The Springs?
A glass or aluminium closure is usually the lower-cost option. Built as a masonry room, use about AED 800 to 1,500 per sq ft as the upper guide.
Does Emaar charge for closing a balcony?
Closing a balcony adds floor area, so Emaar’s AED 1,000 per sq ft fee for Springs townhouses applies, plus the AED 2,000 NOC.
Can every Springs balcony be closed?
Not always. Emaar reviews the look, and we check the slab. See closing a balcony in The Springs.
How much is your fee?
Our engineering fee depends on the drawings and the scope; we review and advise. It is separate from the construction cost and the official fees.
Who can help?
Structural Solutions checks Springs balconies, prepares the drawings contractors price and secures the Emaar NOC and permit. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.