Question · Dubai Municipality · Updated November 2026

Does Dubai Municipality Require a Concrete Restoration Specialist?

You are repairing or strengthening concrete in a Dubai Municipality (DM) area and want to know if a concrete restoration specialist stamp is needed. Here is the answer.

Yes, where strengthening is involved. Dubai Municipality (DM) requires a concrete restoration specialist stamp when the works include strengthening of the structure. Structural Solutions, as consultant, assesses the structure, prepares the repair and strengthening design, coordinates the concrete restoration specialist stamp and follows the file until the final approval. We do not hold the specialist stamp ourselves.

RequiredWhere strengthening is involved
Stamp fromConcrete restoration specialist
WeDesign and coordinate

When

When the restoration specialist stamp comes in

WorksRestoration specialist stamp
Strengthening of columns, beams or slabsRequired
CFRP or jacketingRequired, as these are strengthening; see CFRP strengthening design and approval
Repair combined with strengtheningRequired
Repair with no strengtheningWe confirm the route after the assessment

Other areas

Other authorities

Official sites: Dubai Municipality

What you need to know

  • Strengthening: restoration specialist stamp needed.
  • Assessment first: survey and tests.
  • Specialist contractor carries out the works.
  • We coordinate until final approval.

Documents you will need

  • Existing structural drawings
  • Photos of the damage
  • Test reports, if any
  • Developer or building management NOC

How it works

How we handle restoration with strengthening in DM areas

1. Assess

Survey and tests.

2. Design

Repair and strengthening.

3. Stamp

Specialist coordinated.

4. Submit

To DM.

5. Works

Supervised.

6. Final approval

We follow it.

Questions

DM concrete restoration specialist: questions

Does Dubai Municipality require a concrete restoration specialist?

Yes, where strengthening is involved. DM requires a concrete restoration specialist stamp in that case.

Does Structural Solutions hold the restoration specialist stamp?

No. We design the works and coordinate the specialist stamp.

Who carries out the repair works?

A specialist contractor. We assess, design and supervise.

Which tests come before the design?

A testing laboratory carries out the tests; our engineers choose the tests and read the results. See concrete testing of an existing building.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions designs concrete repair and strengthening in Dubai Municipality areas, coordinates the restoration specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.