Trakhees CED · Concrete · Updated November 2026

Concrete Restoration and Strengthening Stamp for Trakhees

Repair or strengthening of concrete in a Trakhees area such as Palm Jumeirah, Jumeirah Park, The Gardens or JAFZA. Trakhees CED asks for a specialist stamp. Here is how it works.

Trakhees CED asks for a concrete restoration and/or strengthening specialist stamp on concrete repair and strengthening works, in addition to the consultant design. In Nakheel communities the Nakheel NOC comes first. Structural Solutions assesses the structure, prepares the repair or strengthening design, coordinates the specialist stamp and follows the file until the final approval. We do not hold the specialist stamp ourselves.

AuthorityTrakhees CED
StampRestoration or strengthening specialist
FirstNakheel or landlord NOC

Where

Typical Trakhees works

LocationTypical works
Palm Jumeirah villas and towersBalcony and slab repair, column strengthening
Jumeirah Park and Jumeirah IslandsVilla structural repair and strengthening for extensions
The Gardens and Discovery GardensBuilding repair and spalling
JAFZA warehousesSlab repair under racking, column strengthening; see warehouse strengthening

Steel too

Steel works in Trakhees areas

QuestionGuide
Steel calculations for Trakheeswho can stamp steel calculations for Trakhees
Approved steel contractorapproved steel contractor
Trakhees approvalsTrakhees approvals

Official sites: Trakhees

What you need to know

  • Trakhees CED approves.
  • Specialist stamp for restoration or strengthening.
  • Nakheel NOC first in Nakheel areas.
  • We coordinate until final approval.

Documents you will need

  • Existing structural drawings
  • Photos of the damage
  • Nakheel or landlord NOC
  • Test reports, if any

How it works

How we handle restoration for Trakhees

1. Assess

Survey and tests.

2. Design

Repair or strengthening.

3. NOC

Nakheel or landlord.

4. Stamp

Specialist coordinated.

5. Trakhees

Submission.

6. Final approval

We follow it.

Already done

Repairs already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Trakhees concrete restoration: questions

Does Trakhees ask for a concrete restoration specialist stamp?

Yes. Trakhees CED asks for a concrete restoration and/or strengthening specialist stamp.

Who approves strengthening on Palm Jumeirah?

Nakheel gives the NOC, then Trakhees CED approves.

Does Structural Solutions hold the stamp?

No. We design the works and coordinate the specialist stamp.

Do you carry out the repair?

No. A specialist contractor carries out the works; we assess, design and supervise.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions designs concrete repair and strengthening for Trakhees CED, coordinates the specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading