Steel mezzanine · By authority · Updated November 2026

Steel Mezzanine Calculations for DM, DDA and Trakhees

Adding a steel mezzanine to a warehouse, shop, office or villa? The calculations, the steel stamp and the approval route depend on the authority. Structural Solutions prepares the calculations, coordinates the steel stamp and takes it to approval.

Every steel mezzanine in Dubai needs approval before it is built: the landlord, building management or developer NOC, then the authority for the area (Dubai Municipality (DM), Dubai Development Authority (DDA) or Trakhees CED) with stamped structural calculations, a steel specialist stamp on the steel and Dubai Civil Defence (DCD) approval. A mezzanine adds floor area. Structural Solutions checks the existing slab, designs the mezzanine, coordinates the steel stamp and follows the file until the final approval.

ApprovalAlways before building
Steel stampSteel specialist
AlsoDCD; adds floor area

By authority

Steel mezzanine route by authority

AuthorityTypical areasSteel stamp
Dubai Municipality (DM)Al Quoz, Al Qusais, Ras Al Khor, Dubai Investment ParkSteel specialist appointed by the main contractor
Dubai Development Authority (DDA)Dubai Industrial City, TECOM zones, Business BaySteel specialist recognised by DDA
Trakhees CEDJAFZA, Nakheel communitiesSteel specialist or approved steel contractor

Design

What the mezzanine calculations check

ItemWhat is checked
Existing slabCan it take the column loads? Base plates and anchors
Beams and deckFloor loads for the use: storage, office, retail
Columns and bracingStability and connections; see steel connection design
Stairs and handrailsAccess and edge protection
Fire safetyDCD requirements

By use

Mezzanine guides by type of property

Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence

What you need to know

  • Approval first: never build before the permit.
  • Floor area: a mezzanine adds it.
  • DCD approval is needed.
  • Slab check: before design.

Documents you will need

  • Landlord, building management or developer NOC
  • Floor plan and photos of the unit
  • Existing structural drawings, if available
  • Intended use and loads

How it works

How we get a steel mezzanine approved

1. Brief

Use and size.

2. Slab check

Existing structure.

3. Design

Calculations and drawings.

4. Steel stamp

Coordinated.

5. Approvals

Authority and DCD.

6. Final approval

After inspection.

Already done

Mezzanine already built?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Steel mezzanine questions

Do I need a steel specialist for a mezzanine in Trakhees or DDA?

Yes. Steel mezzanines need a steel specialist stamp in Trakhees CED, DDA and Dubai Municipality areas.

Do I need structural calculations for a steel mezzanine?

Yes. Stamped calculations and drawings are needed, with a check of the slab it sits on.

Does a mezzanine need Civil Defence approval?

Yes, DCD approval is needed.

Does a mezzanine count as floor area?

Yes. A mezzanine adds floor area.

Can Structural Solutions handle the whole mezzanine approval?

Yes. We design it, coordinate the steel stamp and follow the file until the final approval.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions designs steel mezzanines, coordinates the steel specialist stamp and takes them to approval with DM, DDA or Trakhees CED. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.