Can I Close My Terrace in Mira Oasis?

Yes, closing a terrace in Mira Oasis is doable, subject to submission and approval. It has been done before, and we can help with yours.

Yes, closing a terrace in Mira Oasis is doable, subject to the submission and approval. It has been done before, and we can help with it. Each case is different, so send us photos and what you would like to do, and we will advise. The work needs the Al Aryam NOC, and DDA approval if it counts as major. We prepare the drawings and calculations and handle the submissions.

AnswerDoable, subject to approval
NeedsAl Aryam NOC
Each caseReviewed separately

Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What you need to know

  • Structure: We check the slab and any new loads.
  • Look: The design should suit the home.
  • Shared walls: Townhouses need care near neighbours’ walls.
  • Drawings: The master developer can give as-built drawings, or we obtain them on your behalf.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

We obtain the as-built drawings from the master developer, or on your behalf, and prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Al Aryam NOC guide →
🏛️

Dubai Development Authority (DDA)

Issues the permit for major works, after the Al Aryam NOC.

Is Al Aryam under DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

Can I close my terrace in Mira Oasis?

Yes, subject to the submission and approval.

Has this been done before?

Yes, and we can help with yours.

Do I need DDA?

If it counts as major works. We check your scope.

What should I send?

Photos and what you would like to do.