DLTM · Plot

Where Do I Get My Plot DLTM Coordinates?

The plot corner coordinates are on your affection plan or site plan. To show what is actually built, or to set out works, you need a site survey in DLTM.

Your plot corner coordinates are shown on the affection plan or site plan of the plot. They tell you where the plot limit is, but not where your walls, paving, driveway or building actually stand. For developer or authority submissions that check works against the plot limit, the site is surveyed in DLTM and the existing and proposed works are drawn in true position.

Plot cornersAffection plan or site plan
What is builtSite survey
For submissionsSurvey-based DLTM drawings

What you need to know

  • Affection plan: Plot corners and plot limit.
  • Site survey: Walls, paving, access and buildings as built.
  • Setting out: Works set out from surveyed points.
  • Mismatch: If works and plot limit differ, the survey shows it.

Documents you will need

  • Affection plan or site plan
  • Any existing drawings: PDF or AutoCAD
  • Photos of the plot and the area of works
  • What the drawings are for: developer NOC, RTA or other

By submission

Where DLTM drawings are needed

We confirm the format for your submission.

SubmissionApproval routeGuides
Developer NOC
AutoCAD DLTM plus PDF
Especially near the plot limit.Developer NOCs
Nakheel plot access
PDF plus AutoCAD DLTM
Common reason for returns.Nakheel
RTA access or ROW NOC
DLTM drawings
Plot vs road reserve.RTA
Demarcation or plot limit
Plot limit drawing
Inside vs outside.Plot limit

How it works

How we prepare DLTM drawings

1. Purpose

Which developer or authority the drawings are for.

2. Site survey

Plot, buildings, boundary, kerbs and features in DLTM.

3. Drawings

Existing and proposed works drawn in true DLTM position.

4. Plot limit

What is inside and outside the plot shown clearly.

5. Check

Drawing checked against the survey points.

6. Delivery

AutoCAD DWG plus PDF, ready to submit.

Who asks for it

Who asks for DLTM drawings

🏘️

Master developers

Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.

Developer NOCs →
🛣️

Authorities such as RTA

Check works against the plot and the road reserve in DLTM.

DLTM for RTA →
📐

Structural Solutions

Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.

Our DLTM survey →

Why DLTM drawings get returned

  • Drawing on a local grid, not in DLTM
  • PDF only, no AutoCAD file
  • Drawing not tied to a site survey
  • Plot limit not shown
  • Works on the drawing not matching the site

Questions

Questions owners and consultants ask

Where are my plot coordinates?

On the affection plan or site plan.

Is the affection plan enough?

For the plot corners, yes; for what is built, a survey is needed.

Can you survey my plot in DLTM?

Yes.

Related guides

Keep reading