Who Can Stamp Structural Calculations for JAFZA?
A structural consultant registered with Trakhees can stamp calculations for JAFZA submissions, prepared in Trakhees CED format.
Format
Trakhees CED format drawings and calculations.
What you need to know
- Free-zone or developer NOC: JAFZA, DIP, Dubai South and other zones approve works first.
- Authority permit: from the authority for the zone.
- Civil Defence: fire and life safety approval for the activity.
- Slab and roof loads: racking, mezzanines and cranes are checked against the structure.
- Completion inspection: before operation.
Documents you will need
- Trade licence
- Lease agreement
- Master developer or free-zone NOC
- Layout, racking and equipment details
- Proposed drawings and stamped structural calculations
At a glance
Who Can Stamp Structural Calculations for JAFZA? at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Designs structural changes, mezzanines and racking supports and prepares stamped drawings and calculations. | — |
| Master developer or free zone Step 2 | Issues the NOC for the works. | — |
| Authority — Trakhees Step 3 | Reviews the drawings and issues the permit. | — |
| Civil Defence (DCD) Step 4 | Fire and life safety approval where required. | — |
| Landlord and authority Step 5 | Completion inspection. | — |
How it works
How We Deliver Industrial Structural Approvals
Site Visit & Existing Drawings
Structural Assessment
Design & Stamped Calculations
Landlord / Zone NOC
Authority Approval
Installation & Sign-Off
Who does what
Who does what in JAFZA
Trakhees
Civil Engineering Department (CED): building permit for structural works and inspection at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits for you as the approved consultant.
Talk to our engineers →Industrial Works We Handle
- Mezzanine
- Racking
- Steel Structure
- Canopy
- Extension
- Assessment
Why applications come back
- Drawings not in the format Trakhees asks for
- No stamped structural calculations
- Works started before the permit
- Missing landlord NOC or licence documents
- Fire safety items not shown
Questions people ask
Related questions
Questions
Questions owners ask
Who stamps JAFZA calculations?
A Trakhees-registered consultant.
Who stamps industrial structural calculations?
An authority-registered structural consultant — for Trakhees, DM, DDA or Dubai South Authority depending on the location.
Do you check the existing structure?
Yes — slabs, columns, roofs and foundations are checked before new loads are added.
Can unapproved structures be regularised?
Often yes, with an assessment, calculations and a retrospective approval.
Is Civil Defence involved?
Often — fire and life safety approval is needed for many industrial activities.
Related guides
