Structural Engineer for Steel Works in Dubai: Design, Drawings and Approval

Looking for a structural engineer for a steel mezzanine, staircase, canopy, roof or warehouse extension? We design the steel, prepare the drawings, coordinate the steel stamp and take the file through the authority.

A structural engineer for steel works designs the members and connections, checks the existing structure where new loads are added, prepares the drawings and calculations, and takes them through Dubai Municipality, DDA or Trakhees. In Dubai the steel also needs an approved steel contractor (also called a steel specialist) stamp, which we coordinate. We design and approve; a steel contractor fabricates and installs.

We designMembers, connections, base plates
We checkExisting structure for new loads
We coordinateThe steel stamp

Design scope

What the structural engineer designs for steel works

ItemWhat is checked
MembersBeams, columns and bracing for dead, live and wind loads
ConnectionsBolted and welded joints; see steel connection design
Base plates and anchorsFixing to the slab or foundation; see base plate and anchor bolt design
Existing structureSlab, beams or foundations that take the new load
Fire and corrosionProtection noted on the drawings where needed

Projects

Steel projects and their guides

By authority

Steel works approval by authority

The plot location decides the authority. We confirm it before starting.

AuthorityTypical areasSteel stamp
Dubai MunicipalityAl Quoz, Al Qusais, Ras Al Khor, Jumeirah, Al Barsha, Emirates LivingDM approved steel contractor (also called a steel specialist)
DDADubai Hills, Arabian Ranches, Business Bay, TECOM zones, Dubai Industrial CityDDA approved steel contractor (also called a steel specialist); see steel specialist stamp for DDA approval
TrakheesJAFZA, Palm Jumeirah, Jumeirah Park, Al Furjan, JVCTrakhees approved steel contractor (also called a steel specialist); see approved steel contractor

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Design and approval: our scope.
  • Fabrication and installation: by a steel contractor.
  • Steel stamp: approved steel contractor, coordinated by us.
  • Existing structure is checked where loads are added.

Documents you will need

  • Concept or architectural drawings
  • Existing structural drawings, if available
  • Photos of the area
  • Landlord or developer NOC, where needed

How it works

How we work on steel projects

1. Brief

What you want to build.

2. Survey

Site and existing structure.

3. Design

Calculations and drawings.

4. Stamp

Steel stamp coordinated.

5. Submit

Authority approval.

6. Site

Inspections.

Already done

Steel works already built?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Structural engineer for steel works: questions

Do I need a structural engineer for steel works in Dubai?

Yes, for approval the steel needs calculations and drawings from a consultant, plus the approved steel contractor (also called a steel specialist) stamp.

Do you design the steel connections?

Yes, connections, base plates and anchors are part of our design.

Can you check if my slab can take a steel mezzanine?

Yes. We check the existing structure before designing.

Do you also get the steel stamp?

We coordinate it with an approved steel contractor (also called a steel specialist). See steel calculations and stamp in one team.

Do you build the steel?

No. A steel contractor fabricates and installs it.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares the steel structural calculations and drawings, coordinates the approved steel contractor (also called a steel specialist) stamp and submits to Dubai Municipality, DDA or Trakhees until approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading