Steel · Aluminium · Shop drawings · Updated November 2026

Steel and Aluminium Shop Drawing Approval in Dubai

Fabricators and contractors: your steel or aluminium shop drawings need structural calculations, a consultant stamp and, for steel, the specialist stamp before the consultant, the developer or the authority accepts them. Structural Solutions prepares the calculations, checks the shop drawings and follows the file until the final approval.

Steel and aluminium shop drawings in Dubai are approved against the structural design. Our engineers prepare and stamp the structural calculations and check the shop drawings (members, connections, base plates and fixings). For steel works, Dubai Municipality (DM), Dubai Development Authority (DDA) and Trakhees CED also ask for the stamp of an approved steel contractor (also called a steel specialist). We coordinate the specialist stamp and follow the file as your consultant until the final approval.

ForFabricators and contractors
We stampThe structural calculations
Steel stampCoordinated by us

What we check

What goes into a shop drawing approval

The shop drawings must match the structural calculations.

ItemWhat our engineers check
MembersSizes and grades against the calculations
ConnectionsBolts, welds and plates; see steel connection design
Base plates and anchorsFixing to the existing slab, wall or foundation
Existing structureWhether the slab, roof or wall can take the new load
Aluminium itemsPergolas, canopies and frames: members, fixings and wind load
CommentsReplies to consultant, developer or authority comments

By authority

Who approves steel and aluminium works

The authority depends on where the site is.

AuthorityWhat it asks for steel works
Dubai Municipality (DM)Consultant calculations, plus a specialist steel contractor or subcontractor appointed by the main contractor
Dubai Development Authority (DDA)Consultant calculations and the approved steel contractor stamp; see who can stamp steel calculations for DDA
Trakhees CEDConsultant calculations and the steel specialist or approved steel contractor stamp; see who can stamp steel calculations for Trakhees

Typical works

Shop drawings we handle

WorksGuide
Steel mezzaninesteel mezzanine calculations by authority
Steel structure or shedsteel structure calculations
Steel connectionssteel connection design
Steel stamp and calculations from one teamsteel calculations and stamp from one team
Who can stamp steel drawingswho can stamp steel drawings

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Calculations first: shop drawings follow them.
  • Consultant stamp: our engineers stamp the calculations.
  • Steel specialist stamp: coordinated by us.
  • Until final approval: we follow the file.

Documents you will need

  • Shop drawings (PDF or CAD)
  • Architectural or layout drawings
  • Site location and authority
  • Main contractor and fabricator details
  • Any comments received

How it works

How we handle shop drawing approval

1. Send

Shop drawings.

2. Check

Against the loads.

3. Calculations

Prepared and stamped.

4. Steel stamp

Coordinated.

5. Comments

Answered.

6. Final approval

We follow it.

Already done

Steel or aluminium already installed without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Shop drawing approval questions

Who approves steel shop drawings in Dubai?

The consultant checks them against the calculations, and the authority for the site (Dubai Municipality, DDA or Trakhees CED) approves the works.

Do steel shop drawings need a specialist stamp?

Yes for steel works: the authority asks for the stamp of an approved steel contractor (also called a steel specialist). We coordinate it.

Can you prepare the calculations for our shop drawings?

Yes. Our engineers prepare and stamp the structural calculations and check the shop drawings.

Do aluminium pergolas and canopies need calculations?

Yes, where the authority or developer asks for them. We check the members, fixings and wind load.

We are a fabricator with several jobs. Can you support all of them?

Yes. Send each job with its drawings and site details and we review them.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares and stamps structural calculations for steel and aluminium shop drawings, coordinates the steel specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading