Who Can Stamp Steel Drawings in Dubai?
Your steel drawings came back asking for a stamp, or a contractor told you an engineer stamp is not enough. Here is who stamps what on steel works in Dubai, and how to get both stamps without chasing two companies.
Two parties stamp steel works in Dubai. The consultant stamps the structural calculations and drawings. An approved steel contractor (also called a steel specialist) recognised by Dubai Municipality, DDA or Trakhees stamps the steel. A normal engineering stamp alone is usually not accepted for the steel part, and a steel contractor stamp alone does not replace the consultant calculations. We prepare the calculations and coordinate the steel stamp together.
Who stamps what
Who stamps what on steel drawings
| Document | Stamped by |
|---|---|
| Structural calculations | The consultant; see engineer-stamped structural calculations |
| Structural drawings for the permit | The consultant |
| Steel design and fabrication drawings | An approved steel contractor (also called a steel specialist) recognised by the authority |
| Shop drawings from the fabricator | Checked against the design; see steel shop drawing approval |
| Third-party verification | Only where the authority asks for it; see third-party verification of steel works |
By authority
Steel works approval by authority
The plot location decides the authority. We confirm it before starting.
| Authority | Typical areas | Steel stamp |
|---|---|---|
| Dubai Municipality | Al Quoz, Al Qusais, Ras Al Khor, Jumeirah, Al Barsha, Emirates Living | DM approved steel contractor (also called a steel specialist) |
| DDA | Dubai Hills, Arabian Ranches, Business Bay, TECOM zones, Dubai Industrial City | DDA approved steel contractor (also called a steel specialist); see steel specialist stamp for DDA approval |
| Trakhees | JAFZA, Palm Jumeirah, Jumeirah Park, Al Furjan, JVC | Trakhees approved steel contractor (also called a steel specialist); see approved steel contractor |
Common problems
Common stamp problems on steel submissions
| Problem | What fixes it |
|---|---|
| Only an engineer stamp on the steel | Add the approved steel contractor (also called a steel specialist) stamp |
| Steel contractor stamp but no calculations | Consultant calculations and drawings |
| Stamp from a contractor for another authority | A stamp recognised by the right authority for the plot |
| Shop drawings differ from the design | Check and revise against the calculations |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Two stamps are usual on steel works.
- Right authority: the steel stamp must be recognised by DM, DDA or Trakhees as the plot requires.
- Steel specialist = approved steel contractor.
- One team: see steel calculations and stamp in one team.
Documents you will need
- The steel drawings
- Any authority comments
- Calculations, if any
- Plot or property details
How it works
How we get steel drawings stamped
1. Send
Drawings and comments.
2. Check
Which stamps are missing.
3. Calculations
Prepared or checked.
4. Steel stamp
Coordinated.
5. Resubmit
Until approval.
Questions
Steel drawing stamp questions
Who can stamp steel drawings in Dubai?
The consultant stamps the calculations and drawings, and an approved steel contractor (also called a steel specialist) recognised by the authority stamps the steel.
Is a structural engineer stamp enough for steel works?
Usually not on its own. The steel part also needs the approved steel contractor stamp.
Can my steel fabricator stamp the drawings?
Only if it is an approved steel contractor recognised by the authority for your plot, and the consultant calculations are still needed.
Can you do the calculations and the steel stamp together?
Yes. We prepare the calculations and coordinate the steel stamp. See steel calculations and stamp in one team.
Does DDA have its own steel stamp?
DDA works need a stamp recognised by DDA. See steel specialist stamp for DDA approval.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions prepares the steel structural calculations and drawings, coordinates the approved steel contractor (also called a steel specialist) stamp and submits to Dubai Municipality, DDA or Trakhees until approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.